SiSU: - Manualul Live Systemscomplete.sisudoc.org/manual/pdf/live-manual.portrait.ro.a4.pdf · ManualulLiveSystems ProiectulLiveSystems Copyright©2006-2014LiveSystemsProject - [PDF Document] (2024)

SiSU: - Manualul Live Systemscomplete.sisudoc.org/manual/pdf/live-manual.portrait.ro.a4.pdf· ManualulLiveSystems ProiectulLiveSystems Copyright©2006-2014LiveSystemsProject - [PDF Document] (1)

Manualul Live Systems

Proiectul Live Systems <[emailprotected]>

SiSU: - Manualul Live Systemscomplete.sisudoc.org/manual/pdf/live-manual.portrait.ro.a4.pdf· ManualulLiveSystems ProiectulLiveSystems Copyright©2006-2014LiveSystemsProject - [PDF Document] (2)

Copyright © 2006-2014 Live Systems ProjectAcest program este liber: poate fi redistribuit și/saumodificat în conformitate cu termeniiLicenței Publice Generale GNU (GPL), precum este publicată de către Free SoftwareFoundation, fie versiunea 3 a licenței, sau (opțional) orice altă versiune ulterioară..

Acest program este distribuit cu speranța că va fi util, dar FĂRĂ NICIO GARANȚIE;fără a avea garanția VANDABILITĂȚII sau ÎNDEPLINIRII UNUI ANUME SCOP. VeziLicența Publică Generală GNU pentru mai multe detalii.

Ar trebui să fi orimit o copie a Licenței Publice Generale GNU împreună cu acestprogram. În caz contrar, vezi ‹http://www.gnu.org/licenses/›.

Textul complet al Licenței Publice Generale poate fi găsit în fișierul /usr/share/common-licenses/GPL-3.

ii

SiSU: - Manualul Live Systemscomplete.sisudoc.org/manual/pdf/live-manual.portrait.ro.a4.pdf· ManualulLiveSystems ProiectulLiveSystems Copyright©2006-2014LiveSystemsProject - [PDF Document] (3)

Contents

Contents

Despre 2

Despre acest manual 3

1. Despre acest manual 31.1 For the impatient . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 31.2 Termeni . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 31.3 Autori . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 51.4 Cum se poate contribui la acest document . . . . . . . . . . . . . . . . . 5

1.4.1 Applying changes . . . . . . . . . . . . . . . . . . . . . . . . . . . 51.4.2 Translation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6

About the Live Systems Project 8

2. About the Live Systems Project 82.1 Motivatie . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8

2.1.1 Ce nu e bine cu sistemele live actuale . . . . . . . . . . . . . . . 82.1.2 De ce e nevoie de propriul nostru sistem live ? . . . . . . . . . . 8

2.2 Filozofia . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 92.2.1 Numai pachete neschimbate din Debian “main” . . . . . . . . . . 92.2.2 Nu vor fi programe de configurare pentru sistemul live. . . . . . . 9

2.3 Contact . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9

Utilizator 10

Installation 11

3. Installation 113.1 Requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 113.2 Installing live-build . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11

3.2.1 From the Debian repository . . . . . . . . . . . . . . . . . . . . . 113.2.2 From source . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 123.2.3 From ‘snapshots’ . . . . . . . . . . . . . . . . . . . . . . . . . . . 12

3.3 Installing live-boot and live-config . . . . . . . . . . . . . . . . . . . . . . 123.3.1 From the Debian repository . . . . . . . . . . . . . . . . . . . . . 133.3.2 From source . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 133.3.3 From ‘snapshots’ . . . . . . . . . . . . . . . . . . . . . . . . . . . 14

iii

SiSU: - Manualul Live Systemscomplete.sisudoc.org/manual/pdf/live-manual.portrait.ro.a4.pdf· ManualulLiveSystems ProiectulLiveSystems Copyright©2006-2014LiveSystemsProject - [PDF Document] (4)

Contents

The basics 15

4. The basics 154.1 What is a live system? . . . . . . . . . . . . . . . . . . . . . . . . . . . . 154.2 Downloading prebuilt images . . . . . . . . . . . . . . . . . . . . . . . . 164.3 Using the web live image builder . . . . . . . . . . . . . . . . . . . . . . 16

4.3.1 Web builder usage and caveats . . . . . . . . . . . . . . . . . . . 164.4 First steps: building an ISO hybrid image . . . . . . . . . . . . . . . . . 174.5 Using an ISO hybrid live image . . . . . . . . . . . . . . . . . . . . . . . 18

4.5.1 Burning an ISO image to a physical medium . . . . . . . . . . . . 184.5.2 Copying an ISO hybrid image to a USB stick . . . . . . . . . . . 184.5.3 Using the space left on a USB stick . . . . . . . . . . . . . . . . . 184.5.4 Booting the live medium . . . . . . . . . . . . . . . . . . . . . . . 19

4.6 Using a virtual machine for testing . . . . . . . . . . . . . . . . . . . . . 194.6.1 Testing an ISO image with QEMU . . . . . . . . . . . . . . . . . . 204.6.2 Testing an ISO image with VirtualBox . . . . . . . . . . . . . . . . 20

4.7 Building and using an HDD image . . . . . . . . . . . . . . . . . . . . . 214.8 Building a netboot image . . . . . . . . . . . . . . . . . . . . . . . . . . . 22

4.8.1 DHCP server . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 234.8.2 TFTP server . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 244.8.3 NFS server . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 244.8.4 Netboot testing HowTo . . . . . . . . . . . . . . . . . . . . . . . . 244.8.5 Qemu . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 25

4.9 Webbooting . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 254.9.1 Getting the webboot files . . . . . . . . . . . . . . . . . . . . . . . 254.9.2 Booting webboot images . . . . . . . . . . . . . . . . . . . . . . . 26

Overview of tools 27

5. Overview of tools 275.1 The live-build package . . . . . . . . . . . . . . . . . . . . . . . . . . . . 27

5.1.1 The lb config command . . . . . . . . . . . . . . . . . . . . . . . 275.1.2 The lb build command . . . . . . . . . . . . . . . . . . . . . . . . 285.1.3 The lb clean command . . . . . . . . . . . . . . . . . . . . . . . . 28

5.2 The live-boot package . . . . . . . . . . . . . . . . . . . . . . . . . . . . 295.3 The live-config package . . . . . . . . . . . . . . . . . . . . . . . . . . . 29

Managing a configuration 30

6. Managing a configuration 306.1 Dealing with configuration changes . . . . . . . . . . . . . . . . . . . . . 30

6.1.1 Why use auto scripts? What do they do? . . . . . . . . . . . . . 306.1.2 Use example auto scripts . . . . . . . . . . . . . . . . . . . . . . 30

iv

SiSU: - Manualul Live Systemscomplete.sisudoc.org/manual/pdf/live-manual.portrait.ro.a4.pdf· ManualulLiveSystems ProiectulLiveSystems Copyright©2006-2014LiveSystemsProject - [PDF Document] (5)

Contents

6.2 Clone a configuration published via Git . . . . . . . . . . . . . . . . . . . 31

Customizing contents 33

7. Customization overview 337.1 Build time vs. boot time configuration . . . . . . . . . . . . . . . . . . . . 337.2 Stages of the build . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 337.3 Supplement lb config with files . . . . . . . . . . . . . . . . . . . . . . . 347.4 Customization tasks . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 34

Customizing package installation 35

8. Customizing package installation 358.1 Package sources . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 35

8.1.1 Distribution, archive areas and mode . . . . . . . . . . . . . . . . 358.1.2 Distribution mirrors . . . . . . . . . . . . . . . . . . . . . . . . . . 368.1.3 Distribution mirrors used at build time . . . . . . . . . . . . . . . 368.1.4 Distribution mirrors used at run time . . . . . . . . . . . . . . . . 368.1.5 Additional repositories . . . . . . . . . . . . . . . . . . . . . . . . 37

8.2 Choosing packages to install . . . . . . . . . . . . . . . . . . . . . . . . 378.2.1 Package lists . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 388.2.2 Using metapackages . . . . . . . . . . . . . . . . . . . . . . . . . 388.2.3 Local package lists . . . . . . . . . . . . . . . . . . . . . . . . . . 398.2.4 Local binary package lists . . . . . . . . . . . . . . . . . . . . . . 398.2.5 Generated package lists . . . . . . . . . . . . . . . . . . . . . . . 398.2.6 Using conditionals inside package lists . . . . . . . . . . . . . . . 408.2.7 Removing packages at install time . . . . . . . . . . . . . . . . . 408.2.8 Desktop and language tasks . . . . . . . . . . . . . . . . . . . . 418.2.9 Kernel flavour and version . . . . . . . . . . . . . . . . . . . . . . 418.2.10 Custom kernels . . . . . . . . . . . . . . . . . . . . . . . . . . . 42

8.3 Installing modified or third-party packages . . . . . . . . . . . . . . . . . 428.3.1 Using packages.chroot to install custom packages . . . . . . . . 438.3.2 Using an APT repository to install custom packages . . . . . . . 438.3.3 Custom packages and APT . . . . . . . . . . . . . . . . . . . . . 43

8.4 Configuring APT at build time . . . . . . . . . . . . . . . . . . . . . . . . 448.4.1 Choosing apt or aptitude . . . . . . . . . . . . . . . . . . . . . . . 448.4.2 Using a proxy with APT . . . . . . . . . . . . . . . . . . . . . . . 448.4.3 Tweaking APT to save space . . . . . . . . . . . . . . . . . . . . 448.4.4 Passing options to apt or aptitude . . . . . . . . . . . . . . . . . . 458.4.5 APT pinning . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 46

v

SiSU: - Manualul Live Systemscomplete.sisudoc.org/manual/pdf/live-manual.portrait.ro.a4.pdf· ManualulLiveSystems ProiectulLiveSystems Copyright©2006-2014LiveSystemsProject - [PDF Document] (6)

Contents

Customizing contents 47

9. Customizing contents 479.1 Includes . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 47

9.1.1 Live/chroot local includes . . . . . . . . . . . . . . . . . . . . . . 479.1.2 Binary local includes . . . . . . . . . . . . . . . . . . . . . . . . . 48

9.2 Hooks . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 489.2.1 Live/chroot local hooks . . . . . . . . . . . . . . . . . . . . . . . . 489.2.2 Boot-time hooks . . . . . . . . . . . . . . . . . . . . . . . . . . . 489.2.3 Binary local hooks . . . . . . . . . . . . . . . . . . . . . . . . . . 49

9.3 Preseeding Debconf questions . . . . . . . . . . . . . . . . . . . . . . . 49

Customizing run time behaviours 50

10. Customizing run time behaviours 5010.1 Customizing the live user . . . . . . . . . . . . . . . . . . . . . . . . . . 5010.2 Customizing locale and language . . . . . . . . . . . . . . . . . . . . . 5010.3 Persistence . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 52

10.3.1 The persistence.conf file . . . . . . . . . . . . . . . . . . . . . . 5410.3.2 Using more than one persistence store . . . . . . . . . . . . . . 54

10.4 Using persistence with encryption . . . . . . . . . . . . . . . . . . . . . 55

Customizing the binary image 58

11. Customizing the binary image 5811.1 Bootloaders . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5811.2 ISO metadata . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 58

Customizing Debian Installer 60

12. Customizing Debian Installer 6012.1 Types of Debian Installer . . . . . . . . . . . . . . . . . . . . . . . . . . 6012.2 Customizing Debian Installer by preseeding . . . . . . . . . . . . . . . 6112.3 Customizing Debian Installer content . . . . . . . . . . . . . . . . . . . 61

Proiect 62

vi

SiSU: - Manualul Live Systemscomplete.sisudoc.org/manual/pdf/live-manual.portrait.ro.a4.pdf· ManualulLiveSystems ProiectulLiveSystems Copyright©2006-2014LiveSystemsProject - [PDF Document] (7)

Contents

Contributing to the project 63

13. Contributing to the project 6313.1 Making changes . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 63

Reporting bugs 65

14. Reporting bugs 6514.1 Known issues . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6514.2 Rebuild from scratch . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6514.3 Use up-to-date packages . . . . . . . . . . . . . . . . . . . . . . . . . . 6614.4 Collect information . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6614.5 Isolate the failing case if possible . . . . . . . . . . . . . . . . . . . . . 6714.6 Use the correct package to report the bug against . . . . . . . . . . . . 67

14.6.1 At build time while bootstrapping . . . . . . . . . . . . . . . . . 6714.6.2 At build time while installing packages . . . . . . . . . . . . . . 6714.6.3 At boot time . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6814.6.4 At run time . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 68

14.7 Do the research . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6814.8 Where to report bugs . . . . . . . . . . . . . . . . . . . . . . . . . . . . 68

Coding Style 69

15. Coding Style 6915.1 Compatibility . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6915.2 Indenting . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6915.3 Wrapping . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6915.4 Variables . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7015.5 Miscellaneous . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 71

Procedures 72

16. Procedures 7216.1 Major Releases . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7216.2 Point Releases . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 72

16.2.1 Last Point Release of a Debian Release . . . . . . . . . . . . . 7216.2.2 Point release announcement template . . . . . . . . . . . . . . 72

vii

SiSU: - Manualul Live Systemscomplete.sisudoc.org/manual/pdf/live-manual.portrait.ro.a4.pdf· ManualulLiveSystems ProiectulLiveSystems Copyright©2006-2014LiveSystemsProject - [PDF Document] (8)

Contents

Git repositories 74

17. Git repositories 7417.1 Handling multiple repositories . . . . . . . . . . . . . . . . . . . . . . . 75

Exemple 76

Exemple 77

18. Examples 7718.1 Using the examples . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7718.2 Tutorial 1: A default image . . . . . . . . . . . . . . . . . . . . . . . . . 7718.3 Tutorial 2: A web browser utility . . . . . . . . . . . . . . . . . . . . . . 7818.4 Tutorial 3: A personalized image . . . . . . . . . . . . . . . . . . . . . 78

18.4.1 First revision . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7918.4.2 Second revision . . . . . . . . . . . . . . . . . . . . . . . . . . . 80

18.5 A VNC Kiosk Client . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8118.6 A base image for a 128MB USB key . . . . . . . . . . . . . . . . . . . 8218.7 A localized GNOME desktop and installer . . . . . . . . . . . . . . . . 83

Anexă 85

Style guide 86

19. Style guide 8619.1 Guidelines for authors . . . . . . . . . . . . . . . . . . . . . . . . . . . 86

19.1.1 Linguistic features . . . . . . . . . . . . . . . . . . . . . . . . . . 8619.1.2 Procedures . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 88

19.2 Guidelines for translators . . . . . . . . . . . . . . . . . . . . . . . . . . 9019.2.1 Translation hints . . . . . . . . . . . . . . . . . . . . . . . . . . . 91

SiSU Metadata, document information 93

viii

SiSU: - Manualul Live Systemscomplete.sisudoc.org/manual/pdf/live-manual.portrait.ro.a4.pdf· ManualulLiveSystems ProiectulLiveSystems Copyright©2006-2014LiveSystemsProject - [PDF Document] (9)

Contents

Manualul Live Systems 1

1

SiSU: - Manualul Live Systemscomplete.sisudoc.org/manual/pdf/live-manual.portrait.ro.a4.pdf· ManualulLiveSystems ProiectulLiveSystems Copyright©2006-2014LiveSystemsProject - [PDF Document] (10)

Contents

Despre 2

2

SiSU: - Manualul Live Systemscomplete.sisudoc.org/manual/pdf/live-manual.portrait.ro.a4.pdf· ManualulLiveSystems ProiectulLiveSystems Copyright©2006-2014LiveSystemsProject - [PDF Document] (11)

Manualul Live Systems

Despre acest manual 3

1. Despre acest manual 4

This manual serves as a single access point to all documentation related to the Live 5

Systems Project and in particular applies to the software produced by the project forthe Debian 8.0 “jessie ” release. An up-to-date version can always be found at ‹http://live-systems.org/›

While live-manual is primarily focused on helping you build a live system and not on 6

end-user topics, an end-user may find some useful information in these sections: ‹TheBasics› covers downloading prebuilt images and preparing images to be booted frommedia or the network, either using the web builder or running live-build directly onyour system. ‹Customizing run time behaviours› describes some options that may bespecified at the boot prompt, such as selecting a keyboard layout and locale, and usingpersistence.

Anumite comenzi din text trebuie sa fie executate ca ‘super_utilizator’, privilegiu care 7

poate fi obtinut fie prin comanda su, sau sudo. Pentru a distinge intre acesti utilizatorise vor folosi $ respectiv # . Aceste simboluri nu fac parte din comenzi.

1.1 For the impatient 8

While we believe that everything in this manual is important to at least some of our 9

users, we realize it is a lot of material to cover and that you may wish to experienceearly success using the software before delving into the details. Therefore, we suggestreading in the following order.

First, read this chapter, ‹About this manual›, from the beginning and ending with the 10

‹Terms› section. Next, skip to the three tutorials at the front of the ‹Examples› sectiondesigned to teach you image building and customization basics. Read ‹Using theexamples› first, followed by ‹Tutorial 1: A default image›, ‹Tutorial 2: A web browserutility› and finally ‹Tutorial 3: A personalized image›. By the end of these tutorials, youwill have a taste of what can be done with live systems.

We encourage you to return to more in-depth study of the manual, perhaps next reading 11

‹The basics›, skimming or skipping ‹Building a netboot image›, and finishing by readingthe ‹Customization overview› and the chapters that follow it. By this point, we hope youare thoroughly excited by what can be done with live systems and motivated to readthe rest of the manual, cover-to-cover.

1.2 Termeni 12

• Live system : An operating system that can boot without installation to a hard drive. 13

Live systems do not alter local operating system(s) or file(s) already installed on thecomputer hard drive unless instructed to do so. Live systems are typically booted

3

SiSU: - Manualul Live Systemscomplete.sisudoc.org/manual/pdf/live-manual.portrait.ro.a4.pdf· ManualulLiveSystems ProiectulLiveSystems Copyright©2006-2014LiveSystemsProject - [PDF Document] (12)

Manualul Live Systems

from media such as CDs, DVDs or USB sticks. Some may also boot over thenetwork (via netboot images, see ‹Building a netboot image›), and over the Internet(via the boot parameter fetch=URL, see ‹Webbooting›).

• Livemedium : As distinct from live system, the live medium refers to the CD, DVD or 14

USB stick where the binary produced by live-build and used to boot the live systemis written. More broadly, the term also refers to any place where this binary residesfor the purposes of booting the live system, such as the location for the network bootfiles.

• Live Systems Project : The project which maintains, among others, the live-boot, 15

live-build, live-config, live-tools and live-manual packages.

• Host system : Mediul folosit pentru crearea sistemului live pe un sistem dat. 16

• Target system : Mediul folosit pentru rularea sistemului live. 17

• live-boot : O coloctie se scripte folosite la p*rnirea sistemului live. 18

• live-build : A collection of scripts used to build customized live systems. 19

• live-config : O colectie de scripte folosite la configurarea sitemului live in timpul 20

procesului de p*rnire.

• live-tools : A collection of additional scripts used to perform useful tasks within a 21

running live system.

• live-manual : Acest document face parte din pachetul numit live-manual. 22

• Debian Installer (d-i) : Sistemul de instalare oficial pentru distributia Debian. 23

• Boot parameters : Parameti care pot fi adaugati la promptul bootloader-ului care 24

sa infuenteze kernelul sau live-config.

• chroot : Programul chroot, chroot(8), permite rularea a diferite instante din mediul 25

GNU/Linux pe un singur sistem si in simultan fara a necesita o rep*rnire a sistemului.

• Binary image : A file containing the live system, such as live-image-i386.hybrid.iso 26

or live-image-i386.img.

• Target distribution : Dea pe care se bazeaza sistemul live. Aceasta distributie 27

poate fi diferita de cea a sistemului gazda.

• stable/testing/unstable : The stable distribution, currently codenamed wheezy , 28

contains the latest officially released distribution of Debian. The testing distribution,temporarily codenamed jessie , is the staging area for the next stable release.A major advantage of using this distribution is that it has more recent versions ofsoftware relative to the stable release. The unstable distribution, permanentlycodenamed sid , is where active development of Debian occurs. Generally, thisdistribution is run by developers and those who like to live on the edge. Throughoutthe manual, we tend to use codenames for the releases, such as jessie or sid , asthat is what is supported by the tools themselves.

4

SiSU: - Manualul Live Systemscomplete.sisudoc.org/manual/pdf/live-manual.portrait.ro.a4.pdf· ManualulLiveSystems ProiectulLiveSystems Copyright©2006-2014LiveSystemsProject - [PDF Document] (13)

Manualul Live Systems

1.3 Autori 29

Lista autorilor (in ordine alfabetica): 30

• Ben Armstrong 31

• Brendan Sleight 32

• Carlos Zuferri 33

• Chris Lamb 34

• Daniel Baumann 35

• Franklin Piat 36

• Jonas Stein 37

• Kai Hendry 38

• Marco Amadori 39

• Mathieu Geli 40

• Matthias Kirschner 41

• Richard Nelson 42

• Trent W. Buck 43

1.4 Cum se poate contribui la acest document 44

This manual is intended as a community project and all proposals for improvements 45

and contributions are extremely welcome. Please see the section ‹Contributing tothe project› for detailed information on how to fetch the commit key and make goodcommits.

1.4.1 Applying changes 46

In order to make changes to the English manual you have to edit the right files in 47

manual/en/ but prior to the submission of your contribution, please preview your work.To preview the live-manual, ensure the packages needed for building it are installed byexecuting:

48

# apt-get install make po4a ruby ruby-nokogiri sisu-complete

Pute-ti crea live-manual de la nivelul de sus al directorului Git checkout al dvs, prin 49

executatea:

50

5

SiSU: - Manualul Live Systemscomplete.sisudoc.org/manual/pdf/live-manual.portrait.ro.a4.pdf· ManualulLiveSystems ProiectulLiveSystems Copyright©2006-2014LiveSystemsProject - [PDF Document] (14)

Manualul Live Systems

$ make build

Since it takes a while to build the manual in all supported languages, authors may 51

find it convenient to use one of the fast proofing shortcuts when reviewing the newdocumentation they have added to the English manual. Using PROOF=1 builds live-manual in html format, but without the segmented html files, and using PROOF=2 buildslive-manual in pdf format, but only the A4 and letter portraits. That is why using eitherof the PROOF= possibilities can save up a considerable amount of time, e.g:

52

$ make build PROOF=1

When proofing one of the translations it is possible to build only one language by 53

executing, e.g:

54

$ make build LANGUAGES=de

It is also possible to build by document type, e.g: 55

56

$ make build FORMATS=pdf

Or combine both, e.g: 57

58

$ make build LANGUAGES=de FORMATS=html

After revising your work andmaking sure that everything is fine, do not use make commit 59

unless you are updating translations in the commit, and in that case, do not mix changesto the English manual and translations in the same commit, but use separate commitsfor each. See the ‹Translation› section for more details.

1.4.2 Translation 60

In order to translate live-manual, follow these steps depending on whether you are 61

starting a translation from scratch or continue working on an already existing one:

• Start a new translation from scratch 62

• Translate the about_manual.ssi.pot , about_project.ssi.pot and index.html.in.pot63

files in manual/pot/ to your language with your favourite editor (such as poedit)

6

SiSU: - Manualul Live Systemscomplete.sisudoc.org/manual/pdf/live-manual.portrait.ro.a4.pdf· ManualulLiveSystems ProiectulLiveSystems Copyright©2006-2014LiveSystemsProject - [PDF Document] (15)

Manualul Live Systems

and send the translated .po files to the mailing list to check their integrity. live-manual’s integrity check not only ensures that the .po files are 100% translatedbut it also detects possible errors.

• Once checked, to enable a new language in the autobuild it is enough to add the 64

initial translated files to manual/po/${LANGUAGE}/ and run make commit. Andthen, edit manual/_sisu/home/index.html adding the name of the languageand its name in English between brackets.

• Continue with an already started translation 65

• If your target language has already been added, you can randomly continue 66

translating the remaining .po files in manual/po/${LANGUAGE}/ using your favouriteeditor (such as poedit) .

• Do not forget that you need to run make commit to ensure that the translated 67

manuals are updated from the .po files and then you can review your changeslaunching make build before git add ., git commit -m “Translating...” andgit push. Remember that since make build can take a considerable amountof time, you can proofread languages individually as explained in ‹Applyingchanges›

After running make commit youwill see some text scroll by. These are basically informative68

messages about the processing status and also some hints about what can be donein order to improve live-manual. Unless you see a fatal error, you usually can proceedand submit your contribution.

live-manual comes with two utilities that can greatly help translators to find untranslated 69

and changed strings. The first one is “make translate”. It launches an script that tellsyou in detail how many untranslated strings there are in each .po file. The second one,the “make fixfuzzy” target, only acts upon changed strings but it helps you to find andfix them one by one.

Keep in mind that even though these utilities might be really helpful to do translation 70

work on the command line, the use of an specialized tool like poedit is the recommendedway to do the task. It is also a good idea to read the Debian localization (l10n)documentation and, specifically to live-manual, the ‹Guidelines for translators›.

Note: You can use make clean to clean your git tree before pushing. This step is not 71

compulsory thanks to the .gitignore file but it is a good practice to avoid committing filesinvoluntarily.

7

SiSU: - Manualul Live Systemscomplete.sisudoc.org/manual/pdf/live-manual.portrait.ro.a4.pdf· ManualulLiveSystems ProiectulLiveSystems Copyright©2006-2014LiveSystemsProject - [PDF Document] (16)

Manualul Live Systems

About the Live Systems Project 72

2. About the Live Systems Project 73

2.1 Motivatie 74

2.1.1 Ce nu e bine cu sistemele live actuale 75

When Live Systems Project was initiated, there were already several Debian based live 76

systems available and they are doing a great job. From the Debian perspective mostof them have one or more of the following disadvantages:

• Ele nu sunt proiecte Debian si drept urmare nu au suport din partea Comunitatii 77

Debian

• Ele amalgameaza diferite distributii, ca testing si unstable . 78

• Ele suporta doar arhitectura i386. 79

• Ele au modificat comportamentul si /sau aspectul programelor pentru a castuga 80

spatiu.

• Acestea includ pachete din afara arhivelor Debian 81

• Ele folosesc kernele modificate care contin patch-uri ce nu fac parte din Debian. 82

• Ele sunt greoaie si lente datorete marimii lor si deci inapropiate pentru situatii de 83

salvare/rescue.

• Ele nu sunt disponibile in diferite sosuri ca CDs, DVDs, USB-stick si netboot images. 84

2.1.2 De ce e nevoie de propriul nostru sistem live ? 85

Debian se considera Sistemul de Operare Universal: Are un mecanism live pentru a se 86

promova in jur si de a prezenta cu acuratete sistemul de operare ce are urmatoarelemari avantaje:

• It is a subproject of Debian. 87

• El reflecta starea (actuala) a distributiei. 88

• Se poate utiliza pe maximum de arhitecturi posibile. 89

• Contine doar programe Debian. 90

• Nu contine nici un pachet care nu este din afara arhivelor Debian. 91

• Foloseste un kernel Debian nealterat, fara patch-uri aditionale. 92

8

SiSU: - Manualul Live Systemscomplete.sisudoc.org/manual/pdf/live-manual.portrait.ro.a4.pdf· ManualulLiveSystems ProiectulLiveSystems Copyright©2006-2014LiveSystemsProject - [PDF Document] (17)

Manualul Live Systems

2.2 Filozofia 93

2.2.1 Numai pachete neschimbate din Debian “main” 94

Se vor folosi numai pachete din depozitul Debian sectiunea “main”. Sectiunea non- 95

free nu este parte a Debian drept urmare nu poate fi folosita nici un fel la construireaimaginilor live cu Debian.

Nu vor fi facute nici o schimbare in programe. Daca este nevoie de acest lucru, 96

schimbarile vor fi facute in coordonare cu responsabilul de program din Debian.

Ca o exceptie, programele specifice ca live-boot, live-build sau live-config pot fi folosite 97

temporar din depozitele proprii live, pentru nevoi de dezvoltare. (de exemplu pentrucreerea de development snapshots). Acestea vor fi upload-ate in Debian la datecuvenite.

2.2.2 Nu vor fi programe de configurare pentru sistemul live. 98

In aceasta faza nu vor fi propuse sau instalate example sau configuratii alternative. 99

Toate programele sunt folosite cu configuratia default ‘de baza’, la fel ca in instalatianormaladin Debian.

In caz de nevoie a unei configuratii diferite, aceasta schimbare va fii facuta in coordonare 100

cu responsabilui de program din Debian.

A system for configuring packages is provided using debconf allowing custom configured 101

packages to be installed in your custom produced live system images, but for the‹prebuilt live images› we choose to leave packages in their default configuration, unlessabsolutely necessary in order to work in the live environment. Wherever possible, weprefer to adapt packages within the Debian archive to work better in a live systemversus making changes to the live toolchain or ‹prebuilt image configurations›. Formore information, please see ‹Customization overview›.

2.3 Contact 102

• Mailing list : The primary contact for the project is the mailing list at ‹http://lists.debian. 103

org/debian-live/›. You can email the list directly by addressing your mail to ‹[emailprotected].› The list archives are available at ‹http://lists.debian.org/debian-live/›.

• IRC : Un numar de utilizatori si dezvoltatori sunt prezenti in canalul #debian-live pe 104

n irc.debian.org (OFTC). Daca aveti o intrebare pentru IRC , fiti cu multa rabdare inasteptarea raspunsului. In caz de lipsa a unui raspuns , folositi mailing list.

• BTS : BTS adica ‹Reporting bugs›. 105

9

[emailprotected].

[emailprotected].

SiSU: - Manualul Live Systemscomplete.sisudoc.org/manual/pdf/live-manual.portrait.ro.a4.pdf· ManualulLiveSystems ProiectulLiveSystems Copyright©2006-2014LiveSystemsProject - [PDF Document] (18)

Manualul Live Systems

Utilizator 106

10

SiSU: - Manualul Live Systemscomplete.sisudoc.org/manual/pdf/live-manual.portrait.ro.a4.pdf· ManualulLiveSystems ProiectulLiveSystems Copyright©2006-2014LiveSystemsProject - [PDF Document] (19)

Manualul Live Systems

Installation 107

3. Installation 108

3.1 Requirements 109

Building live system images has very few system requirements: 110

• Superuser (root) access 111

• An up-to-date version of live-build 112

• A POSIX-compliant shell, such as bash or dash 113

• python3 114

• debootstrap or cdebootstrap 115

• Linux 2.6 or newer. 116

Note that using Debian or a Debian-derived distribution is not required - live-build will 117

run on almost any distribution with the above requirements.

3.2 Installing live-build 118

You can install live-build in a number of different ways: 119

• From the Debian repository 120

• From source 121

• From snapshots 122

If you are using Debian, the recommended way is to install live-build via the Debian 123

repository.

3.2.1 From the Debian repository 124

Simply install live-build like any other package: 125

126

# apt-get install live-build

11

SiSU: - Manualul Live Systemscomplete.sisudoc.org/manual/pdf/live-manual.portrait.ro.a4.pdf· ManualulLiveSystems ProiectulLiveSystems Copyright©2006-2014LiveSystemsProject - [PDF Document] (20)

Manualul Live Systems

3.2.2 From source 127

live-build is developed using the Git version control system. On Debian based systems, 128

this is provided by the git package. To check out the latest code, execute:129

$ git clone git://live-systems.org/git/live-build.git

You can build and install your own Debian package by executing: 130

131

$ cd live-build$ dpkg-buildpackage -b -uc -us$ cd ..

Now install whichever of the freshly built .deb files you were interested in, e.g. 132

133

# dpkg -i live-build_3.0-1_all.deb

You can also install live-build directly to your system by executing: 134

135

# make install

and uninstall it with: 136

137

# make uninstall

3.2.3 From ‘snapshots’ 138

If you do not wish to build or install live-build from source, you can use snapshots. 139

These are built automatically from the latest version in Git and are available on ‹http://live-systems.org/debian/›.

3.3 Installing live-boot and live-config 140

Note: You do not need to install live-boot or live-config on your system to create 141

customized live systems. However, doing so will do no harm and is useful for referencepurposes. If you only want the documentation, you may now install the live-boot-docand live-config-doc packages separately.

12

SiSU: - Manualul Live Systemscomplete.sisudoc.org/manual/pdf/live-manual.portrait.ro.a4.pdf· ManualulLiveSystems ProiectulLiveSystems Copyright©2006-2014LiveSystemsProject - [PDF Document] (21)

Manualul Live Systems

3.3.1 From the Debian repository 142

Both live-boot and live-config are available from the Debian repository as per ‹Installing 143

live-build›.

3.3.2 From source 144

To use the latest source from git, you can follow the process below. Please ensure you 145

are familiar with the terms mentioned in ‹Terms›.

• Checkout the live-boot and live-config sources 146

147

$ git clone git://live-systems.org/git/live-boot.git$ git clone git://live-systems.org/git/live-config.git

Consult the live-boot and live-configman pages for details on customizing if that is your 148

reason for building these packages from source.

• Build live-boot and live-config .deb files 149

You must build either on your target distribution or in a chroot containing your target 150

platform: this means if your target is jessie then you should build against jessie .

Use a personal builder such as pbuilder or sbuild if you need to build live-boot for a 151

target distribution that differs from your build system. For example, for jessie liveimages, build live-boot in a jessie chroot. If your target distribution happens to matchyour build system distribution, you may build directly on the build system using dpkg-

buildpackage (provided by the dpkg-dev package):

152

$ cd live-boot$ dpkg-buildpackage -b -uc -us$ cd ../live-config$ dpkg-buildpackage -b -uc -us

• Use applicable generated .deb files 153

As live-boot and live-config are installed by live-build system, installing the packages 154

in the host system is not sufficient: you should treat the generated .deb files like anyother custom packages. Since your purpose for building from source is likely to testnew things over the short term before the official release, follow ‹Installing modified orthird-party packages› to temporarily include the relevant files in your configuration. Inparticular, notice that both packages are divided into a generic part, a documentationpart and one or more back-ends. Include the generic part, only one back-end matchingyour configuration, and optionally the documentation. Assuming you are building a liveimage in the current directory and have generated all .deb files for a single version

13

SiSU: - Manualul Live Systemscomplete.sisudoc.org/manual/pdf/live-manual.portrait.ro.a4.pdf· ManualulLiveSystems ProiectulLiveSystems Copyright©2006-2014LiveSystemsProject - [PDF Document] (22)

Manualul Live Systems

of both packages in the directory above, these bash commands would copy all of therelevant packages including default back-ends:

155

$ cp ../live-boot{_,-initramfs-tools,-doc}*.deb config/packages.chroot/$ cp ../live-config{_,-sysvinit,-doc}*.deb config/packages.chroot/

3.3.3 From ‘snapshots’ 156

You can let live-build automatically use the latest snapshots of live-boot and live-config 157

by configuring the package repository on live-systems.org as a third-party repository inyour live-build configuration directory.

14

SiSU: - Manualul Live Systemscomplete.sisudoc.org/manual/pdf/live-manual.portrait.ro.a4.pdf· ManualulLiveSystems ProiectulLiveSystems Copyright©2006-2014LiveSystemsProject - [PDF Document] (23)

Manualul Live Systems

The basics 158

4. The basics 159

This chapter contains a brief overview of the build process and instructions for using the 160

three most commonly used image types. The most versatile image type, iso-hybrid,may be used on a virtual machine, optical medium or USB portable storage device. Incertain special cases, as explained later, the hdd type may be more suitable. Thechapter includes detailed instructions for building and using a netboot type image,which is a bit more involved due to the setup required on the server. This is anslightly advanced topic for anyone who is not already familiar with netbooting, but itis included here because once the setup is done, it is a very convenient way to test anddeploy images for booting on the local network without the hassle of dealing with imagemedia.

The section finishes with a quick introduction to ‹webbooting› which is, perhaps, the 161

easiest way of using different images for different purposes, switching from one to theother as needed using the internet as a means.

Throughout the chapter, we will often refer to the default filenames produced by live- 162

build. If you are ‹downloading a prebuilt image› instead, the actual filenames mayvary.

4.1 What is a live system? 163

A live system usuallymeans an operating system booted on a computer from a removable 164

medium, such as a CD-ROM or USB stick, or from a network, ready to use withoutany installation on the usual drive(s), with auto-configuration done at run time (see‹Terms›).

With live systems, it’s an operating system, built for one of the supported architectures 165

(currently amd64 and i386). It is made from the following parts:

• Linux kernel image , usually named vmlinuz* 166

• Initial RAM disk image (initrd) : a RAM disk set up for the Linux boot, containing 167

modules possibly needed to mount the System image and some scripts to do it.

• System image : The operating system’s filesystem image. Usually, a SquashFS 168

compressed filesystem is used to minimize the live system image size. Note thatit is read-only. So, during boot the live system will use a RAM disk and ‘union’mechanism to enable writing files within the running system. However, all modificationswill be lost upon shutdown unless optional persistence is used (see ‹Persistence›).

• Bootloader : A small piece of code crafted to boot from the chosenmedium, possibly 169

presenting a prompt or menu to allow selection of options/configuration. It loadsthe Linux kernel and its initrd to run with an associated system filesystem. Differentsolutions can be used, depending on the target medium and format of the filesystem

15

SiSU: - Manualul Live Systemscomplete.sisudoc.org/manual/pdf/live-manual.portrait.ro.a4.pdf· ManualulLiveSystems ProiectulLiveSystems Copyright©2006-2014LiveSystemsProject - [PDF Document] (24)

Manualul Live Systems

containing the previously mentioned components: isolinux to boot from a CD or DVDin ISO9660 format, syslinux for HDD or USB drive booting from a VFAT partition,extlinux for ext2/3/4 and btrfs partitions, pxelinux for PXE netboot, GRUB for ext2/-3/4 partitions, etc.

You can use live-build to build the system image from your specifications, set up a 170

Linux kernel, its initrd, and a bootloader to run them, all in one medium-dependantformat (ISO9660 image, disk image, etc.).

4.2 Downloading prebuilt images 171

While the focus of this manual is developing and building your own live images, you 172

may simply wish to try one of our prebuilt images, either as an introduction to theiruse or instead of building your own. These images are built using our ‹live-imagesgit repository› and official stable releases are published at ‹http://www.debian.org/CD/live/›.In addition, older and upcoming releases, and unofficial images containing non-freefirmware and drivers are available at ‹http://live-systems.org/cdimage/release/›.

4.3 Using the web live image builder 173

As a service to the community, we run a web-based live image builder service at ‹http:// 174

live-build.debian.net/›. This site is maintained on a best effort basis. That is, although we striveto keep it up-to-date and operational at all times, and do issue notices for significantoperational outages, we cannot guarantee 100% availability or fast image building, andthe service may occasionally have issues that take some time to resolve. If you haveproblems or questions about the service, please ‹contact us›, providing us with the linkto your build.

4.3.1 Web builder usage and caveats 175

Theweb interface currentlymakes no provision to prevent the use of invalid combinations 176

of options, and in particular, where changing an option would normally (i.e. using live-build directly) change defaults of other options listed in the web form, the web builderdoes not change these defaults. Most notably, if you change --architectures from thedefault i386 to amd64, you must change the corresponding option --linux-flavours

from the default 486 to amd64. See the lb_config man page for the version of live-buildinstalled on the web builder for more details. The version number of live-build is listedat the bottom of the web builder page.

The time estimate given by the web builder is a crude estimate only and may not reflect 177

how long your build actually takes. Nor is the estimate updated once it is displayed.Please be patient. Do not refresh the page you land on after submitting the build, asthis will resubmit a new build with the same parameters. You should ‹contact us› ifyou don’t receive notification of your build only once you are certain you’ve waited long

16

SiSU: - Manualul Live Systemscomplete.sisudoc.org/manual/pdf/live-manual.portrait.ro.a4.pdf· ManualulLiveSystems ProiectulLiveSystems Copyright©2006-2014LiveSystemsProject - [PDF Document] (25)

Manualul Live Systems

enough and verified the notification e-mail did not get caught by your own e-mail spamfilter.

The web builder is limited in the kinds of images it can build. This keeps it simple and 178

efficient to use and maintain. If you would like to make customizations that are notprovided for by the web interface, the rest of this manual explains how to build yourown images using live-build.

4.4 First steps: building an ISO hybrid image 179

Regardless of the image type, you will need to perform the same basic steps to build an 180

image each time. As a first example, create a build directory, change to that directoryand then execute the following sequence of live-build commands to create a basic ISOhybrid image containing a default live system without X.org. It is suitable for burning toCD or DVD media, and also to copy onto a USB stick.

The name of the working directory is absolutely up to you, but if you take a look at the 181

examples used throughout live-manual, it is a good idea to use a name that helps youidentify the image you are working with in each directory, especially if you are workingor experimenting with different image types. In this case you are going to build a defaultsystem so let’s call it, for example, live-default.

182

$ mkdir live-default && cd live-default

Then, run the lb config commands. This will create a “config/” hierarchy in the current 183

directory for use by other commands:

184

$ lb config

No parameters are passed to these commands, so defaults for all of their various 185

options will be used. See ‹The lb config command› for more details.

Now that the “config/” hierarchy exists, build the imagewith the lb build command: 186

187

# lb build

This process can take a while, depending on the speed of your computer and your 188

network connection. When it is complete, there should be a live-image-i386.hybrid.isoimage file, ready to use, in the current directory.

17

SiSU: - Manualul Live Systemscomplete.sisudoc.org/manual/pdf/live-manual.portrait.ro.a4.pdf· ManualulLiveSystems ProiectulLiveSystems Copyright©2006-2014LiveSystemsProject - [PDF Document] (26)

Manualul Live Systems

4.5 Using an ISO hybrid live image 189

After either building or downloading an ISO hybrid image, which can be obtained at 190

‹http://www.debian.org/CD/live/›, the usual next step is to prepare your medium for booting,either CD-R(W) or DVD-R(W) optical media or a USB stick.

4.5.1 Burning an ISO image to a physical medium 191

Burning an ISO image is easy. Just install xorriso and use it from the command-line to 192

burn the image. For instance:

193

# apt-get install xorriso$ xorriso -as cdrecord -v dev=/dev/sr0 blank=as_needed live-image-i386.hybrid.iso

4.5.2 Copying an ISO hybrid image to a USB stick 194

ISO images prepared with xorriso, can be simply copied to a USB stick with the cp 195

program or an equivalent. Plug in a USB stick with a size large enough for your imagefile and determine which device it is, which we hereafter refer to as ${USBSTICK}. Thisis the device file of your key, such as /dev/sdb, not a partition, such as /dev/sdb1! Youcan find the right device name by looking in dmesg’s output after plugging in the stick,or better yet, ls -l /dev/disk/by-id.

Once you are certain you have the correct device name, use the cp command to copy 196

the image to the stick. This will definitely overwrite any previous contents on yourstick!

197

$ cp live-image-i386.hybrid.iso ${USBSTICK}$ sync

Note: The sync command is useful to ensure that all the data, which is stored in 198

memory by the kernel while copying the image, is written to the USB stick.

4.5.3 Using the space left on a USB stick 199

After copying the live-image-i386.hybrid.iso to a USB stick, the first partition on 200

the device will be filled up by the live system. To use the remaining free space, use apartitioning tool such as gparted or parted to create a new partition on the stick.

201

# gparted ${USBSTICK}

18

SiSU: - Manualul Live Systemscomplete.sisudoc.org/manual/pdf/live-manual.portrait.ro.a4.pdf· ManualulLiveSystems ProiectulLiveSystems Copyright©2006-2014LiveSystemsProject - [PDF Document] (27)

Manualul Live Systems

After the partition is created, where ${PARTITION} is the name of the partition, such 202

as /dev/sdb2, you have to create a filesystem on it. One possible choice would beext4.

203

# mkfs.ext4 ${PARTITION}

Note: If you want to use the extra space with Windows, apparently that OS cannot 204

normally access any partitions but the first. Some solutions to this problem have beendiscussed on our ‹mailing list›, but it seems there are no easy answers.

Remember: Every time you install a new live-image-i386.hybrid.iso on the stick, 205

all data on the stick will be lost because the partition table is overwritten by thecontents of the image, so back up your extra partition first to restore again afterupdating the live image.

4.5.4 Booting the live medium 206

The first time you boot your live medium, whether CD, DVD, USB key, or PXE boot, 207

some setup in your computer’s BIOS may be needed first. Since BIOSes vary greatlyin features and key bindings, we cannot get into the topic in depth here. Some BIOSesprovide a key to bring up a menu of boot devices at boot time, which is the easiest wayif it is available on your system. Otherwise, you need to enter the BIOS configurationmenu and change the boot order to place the boot device for the live system beforeyour normal boot device.

Once you’ve booted the medium, you are presented with a boot menu. If you just press 208

enter here, the system will boot using the default entry, Live and default options. Formore information about boot options, see the “help” entry in the menu and also thelive-boot and live-config man pages found within the live system.

Assuming you’ve selected Live and booted a default desktop live image, after the boot 209

messages scroll by, you should be automatically logged into the user account and seea desktop, ready to use. If you have booted a console-only image, such as standard orrescue flavour ‹prebuilt images›, you should be automatically logged in on the consoleto the user account and see a shell prompt, ready to use.

4.6 Using a virtual machine for testing 210

It can be a great time-saver for the development of live images to run them in a virtual 211

machine (VM). This is not without its caveats:

• Running a VM requires enough RAM for both the guest OS and the host and a CPU 212

with hardware support for virtualization is recommended.

19

SiSU: - Manualul Live Systemscomplete.sisudoc.org/manual/pdf/live-manual.portrait.ro.a4.pdf· ManualulLiveSystems ProiectulLiveSystems Copyright©2006-2014LiveSystemsProject - [PDF Document] (28)

Manualul Live Systems

• There are some inherent limitations to running on a VM, e.g. poor video performance, 213

limited choice of emulated hardware.

• When developing for specific hardware, there is no substitute for running on the 214

hardware itself.

• Occasionally there are bugs that relate only to running in a VM. When in doubt, test 215

your image directly on the hardware.

Provided you can work within these constraints, survey the available VM software and 216

choose one that is suitable for your needs.

4.6.1 Testing an ISO image with QEMU 217

The most versatile VM in Debian is QEMU. If your processor has hardware support for 218

virtualization, use the qemu-kvm package; the qemu-kvm package description brieflylists the requirements.

First, install qemu-kvm if your processor supports it. If not, install qemu, in which case 219

the program name is qemu instead of kvm in the following examples. The qemu-utilspackage is also valuable for creating virtual disk images with qemu-img.

220

# apt-get install qemu-kvm qemu-utils

Booting an ISO image is simple: 221

222

$ kvm -cdrom live-image-i386.hybrid.iso

See the man pages for more details. 223

4.6.2 Testing an ISO image with VirtualBox 224

In order to test the ISO with virtualbox: 225

226

# apt-get install virtualbox virtualbox-qt virtualbox-dkms$ virtualbox

Create a new virtual machine, change the storage settings to use live-image-i386.hybrid.iso227

as the CD/DVD device, and start the machine.

Note: For live systems containing X.org that you want to test with virtualbox, you 228

may wish to include the VirtualBox X.org driver package, virtualbox-guest-dkms and

20

SiSU: - Manualul Live Systemscomplete.sisudoc.org/manual/pdf/live-manual.portrait.ro.a4.pdf· ManualulLiveSystems ProiectulLiveSystems Copyright©2006-2014LiveSystemsProject - [PDF Document] (29)

Manualul Live Systems

virtualbox-guest-x11, in your live-build configuration. Otherwise, the resolution is limitedto 800x600.

229

$ echo "virtualbox-guest-dkms virtualbox-guest-x11" >> config/package-lists/my.list.chroot

In order to make the dkms package work, also the kernel headers for the kernel flavour 230

used in your image need to be installed. Instead of manually listing the correct linux-headers package in above created package list, the selection of the right package canbe done automatically by live-build.

231

$ lb config --linux-packages "linux-image linux-headers"

4.7 Building and using an HDD image 232

Building an HDD image is similar to an ISO hybrid one in all respects except you specify 233

-b hdd and the resulting filename is live-image-i386.img which cannot be burnt tooptical media. It is suitable for booting from USB sticks, USB hard drives, and variousother portable storage devices. Normally, an ISO hybrid image can be used for thispurpose instead, but if you have a BIOS which does not handle hybrid images properly,you need an HDD image.

Note: if you created an ISO hybrid image with the previous example, you will need 234

to clean up your working directory with the lb clean command (see ‹The lb cleancommand›):

235

# lb clean --binary

Run the lb config command as before, except this time specifying the HDD image 236

type:

237

$ lb config -b hdd

Now build the image with the lb build command: 238

239

# lb build

21

SiSU: - Manualul Live Systemscomplete.sisudoc.org/manual/pdf/live-manual.portrait.ro.a4.pdf· ManualulLiveSystems ProiectulLiveSystems Copyright©2006-2014LiveSystemsProject - [PDF Document] (30)

Manualul Live Systems

When the build finishes, a live-image-i386.img file should be present in the current 240

directory.

The generated binary image contains a VFAT partition and the syslinux bootloader, 241

ready to be directly written on a USB device. Once again, using an HDD image isjust like using an ISO hybrid one on USB. Follow the instructions in ‹Using an ISOhybrid live image›, except use the filename live-image-i386.img instead of live-image-i386.hybrid.iso.

Likewise, to test an HDD image with Qemu, install qemu as described above in ‹Testing 242

an ISO image with QEMU›. Then run kvm or qemu, depending on which version yourhost system needs, specifying live-image-i386.img as the first hard drive.

243

$ kvm -hda live-image-i386.img

4.8 Building a netboot image 244

The following sequence of commands will create a basic netboot image containing a 245

default live system without X.org. It is suitable for booting over the network.

Note: if you performed any previous examples, you will need to clean up your working 246

directory with the lb clean command:

247

# lb clean

In this specific case, a lb clean --binarywould not be enough to clean up the necessary 248

stages. The cause for this is that in netboot setups, a different initramfs configurationneeds to be used which live-build performs automatically when building netboot images.Since the initramfs creation belongs to the chroot stage, switching to netboot in anexisting build directory means to rebuild the chroot stage too. Therefore, lb clean

(which will remove the chroot stage, too) needs to be used.

Run the lb config command as follows to configure your image for netbooting: 249

250

$ lb config -b netboot --net-root-path "/srv/debian-live" --net-root-server "192.168.0.2"

In contrast with the ISO andHDD images, netbooting does not, itself, serve the filesystem 251

image to the client, so the files must be served via NFS. Different network filesystemscan be chosen through lb config. The --net-root-path and --net-root-server optionsspecify the location and server, respectively, of the NFS server where the filesystem

22

SiSU: - Manualul Live Systemscomplete.sisudoc.org/manual/pdf/live-manual.portrait.ro.a4.pdf· ManualulLiveSystems ProiectulLiveSystems Copyright©2006-2014LiveSystemsProject - [PDF Document] (31)

Manualul Live Systems

image will be located at boot time. Make sure these are set to suitable values for yournetwork and server.

Now build the image with the lb build command: 252

253

# lb build

In a network boot, the client runs a small piece of software which usually resides on 254

the EPROM of the Ethernet card. This program sends a DHCP request to get an IPaddress and information about what to do next. Typically, the next step is getting ahigher level bootloader via the TFTP protocol. That could be pxelinux, GRUB, or evenboot directly to an operating system like Linux.

For example, if you unpack the generated live-image-i386.netboot.tar archive in the 255

/srv/debian-live directory, you’ll find the filesystem image in live/filesystem.squashfsand the kernel, initrd and pxelinux bootloader in tftpboot/.

We must now configure three services on the server to enable netbooting: the DHCP 256

server, the TFTP server and the NFS server.

4.8.1 DHCP server 257

We must configure our network’s DHCP server to be sure to give an IP address to the 258

netbooting client system, and to advertise the location of the PXE bootloader.

Here is an example for inspiration, written for the ISC DHCP server isc-dhcp-server 259

in the /etc/dhcp/dhcpd.conf configuration file:

260

# /etc/dhcp/dhcpd.conf - configuration file for isc-dhcp-server

ddns-update-style none;

option domain-name "example.org";option domain-name-servers ns1.example.org, ns2.example.org;

default-lease-time 600;max-lease-time 7200;

log-facility local7;

subnet 192.168.0.0 netmask 255.255.255.0 {range 192.168.0.1 192.168.0.254;filename "pxelinux.0";next-server 192.168.0.2;option subnet-mask 255.255.255.0;option broadcast-address 192.168.0.255;option routers 192.168.0.1;

}

23

SiSU: - Manualul Live Systemscomplete.sisudoc.org/manual/pdf/live-manual.portrait.ro.a4.pdf· ManualulLiveSystems ProiectulLiveSystems Copyright©2006-2014LiveSystemsProject - [PDF Document] (32)

Manualul Live Systems

4.8.2 TFTP server 261

This serves the kernel and initial ramdisk to the system at run time. 262

You should install the tftpd-hpa package. It can serve all files contained inside a root 263

directory, usually /srv/tftp. To let it serve files inside /srv/debian-live/tftpboot,run as root the following command:

264

# dpkg-reconfigure -plow tftpd-hpa

and fill in the new tftp server directory when being asked about it. 265

4.8.3 NFS server 266

Once the guest computer has downloaded and booted a Linux kernel and loaded its 267

initrd, it will try to mount the Live filesystem image through a NFS server.

You need to install the nfs-kernel-server package. 268

Then, make the filesystem image available through NFS by adding a line like the 269

following to /etc/exports:

270

/srv/debian-live *(ro,async,no_root_squash,no_subtree_check)

and tell the NFS server about this new export with the following command: 271

272

# exportfs -rv

Setting up these three services can be a little tricky. You might need some patience to 273

get all of themworking together. For more information, see the syslinux wiki at ‹http://www.syslinux.org/wiki/index.php/PXELINUX› or the Debian Installer Manual’s TFTP Net Booting sectionat ‹http://d-i.alioth.debian.org/manual/en.i386/ch04s05.html›. They might help, as their processes arevery similar.

4.8.4 Netboot testing HowTo 274

Netboot image creation is made easy with live-build, but testing the images on physical 275

machines can be really time consuming.

To make our life easier, we can use virtualization. 276

24

SiSU: - Manualul Live Systemscomplete.sisudoc.org/manual/pdf/live-manual.portrait.ro.a4.pdf· ManualulLiveSystems ProiectulLiveSystems Copyright©2006-2014LiveSystemsProject - [PDF Document] (33)

Manualul Live Systems

4.8.5 Qemu 277

• Install qemu, bridge-utils, sudo. 278

Edit /etc/qemu-ifup: 279

280

#!/bin/shsudo -p "Password for $0:" /sbin/ifconfig $1 172.20.0.1echo "Executing /etc/qemu-ifup"echo "Bringing up $1 for bridged mode..."sudo /sbin/ifconfig $1 0.0.0.0 promisc upecho "Adding $1 to br0..."sudo /usr/sbin/brctl addif br0 $1sleep 2

Get, or build a grub-floppy-netboot. 281

Launch qemu with “-net nic,vlan=0 -net tap,vlan=0,ifname=tun0” 282

4.9 Webbooting 283

Webbooting is a convenient way of retrieving and booting live systems using the internet 284

as ameans. The requirements for webbooting are very few. On the one hand, you needa medium with a bootloader, an initial ramdisk and a kernel. On the other hand, a webserver to store the squashfs files which contain the filesystem.

4.9.1 Getting the webboot files 285

As usual, you can build the images yourself or use the pre-built files, which are available 286

on the project’s homepage at ‹http://live-systems.org/›. Using pre-built imageswould be handyfor doing initial testing until one can fine tune their own needs. If you have built a liveimage you will find the files needed for webbooting in the build directory under binary/-live/. The files are called vmlinuz, initrd.img and filesystem.squashfs.

It is also possible to extract those files from an already existing iso image. In order to 287

achieve that, loopback mount the image as follows:

288

# mount -o loop image.iso /mnt

The files are to be found under the live/ directory. In this specific case, it would be 289

/mnt/live/. This method has the disadvantage that you need to be root to be able tomount the image. However, it has the advantage that it is easily scriptable and thus,easily automatized.

But undoubtedly, the easiest way of extracting the files from an iso image and uploading 290

25

SiSU: - Manualul Live Systemscomplete.sisudoc.org/manual/pdf/live-manual.portrait.ro.a4.pdf· ManualulLiveSystems ProiectulLiveSystems Copyright©2006-2014LiveSystemsProject - [PDF Document] (34)

Manualul Live Systems

it to the web server at the same time, is using the midnight commander or mc. Ifyou have the genisoimage package installed, the two-pane file manager allows youto browse the contents of an iso file in one pane and upload the files via ftp in theother pane. Even though this method requires manual work, it does not require rootprivileges.

4.9.2 Booting webboot images 291

While some users will prefer virtualization to test webbooting, we refer to real hardware 292

here to match the following possible use case which should only be considered as anexample.

In order to boot a webboot image it is enough to have the componentsmentioned above, 293

i.e. vmlinuz and initrd.img in a usb stick inside a directory named live/ and installsyslinux as bootloader. Then boot from the usb stick and type fetch=URL/PATH/TO/-

FILE at the boot options. live-boot will retrieve the squashfs file and store it into ram.This way, it is possible to use the downloaded compressed filesystem as a regular livesystem. For example:

294

append boot=live components fetch=http://192.168.2.50/images/webboot/filesystem.squashfs

Use case: You have a web server in which you have stored two squashfs files, one 295

which contains a full desktop, like for example gnome, and a rescue one. If you needa graphical environment for one machine, you can plug your usb stick in and webbootthe gnome image. If you need the rescue tools included in the second type of image,perhaps for another machine, you can webboot the rescue one.

26

SiSU: - Manualul Live Systemscomplete.sisudoc.org/manual/pdf/live-manual.portrait.ro.a4.pdf· ManualulLiveSystems ProiectulLiveSystems Copyright©2006-2014LiveSystemsProject - [PDF Document] (35)

Manualul Live Systems

Overview of tools 296

5. Overview of tools 297

This chapter contains an overview of the three main tools used in building live systems: 298

live-build, live-boot and live-config.

5.1 The live-build package 299

live-build is a collection of scripts to build live systems. These scripts are also referred 300

to as “commands”.

The idea behind live-build is to be a framework that uses a configuration directory to 301

completely automate and customize all aspects of building a Live image.

Many concepts are similar to those used to build Debian packages with debhelper: 302

• The scripts have a central location for configuring their operation. In debhelper, 303

this is the debian/ subdirectory of a package tree. For example, dh_install willlook, among others, for a file called debian/install to determine which files shouldexist in a particular binary package. In much the same way, live-build stores itsconfiguration entirely under a config/ subdirectory.

• The scripts are independent - that is to say, it is always safe to run each command. 304

Unlike debhelper, live-build provides the tools to generate a skeleton configuration 305

directory. This could be considered to be similar to tools such as dh-make. For moreinformation about these tools, read on, since the remainder of this section discuses thefour most important commands. Note that the preceding lb is a generic wrapper forlive-build commands.

• lb config : Responsible for initializing and configuring a Live system configuration 306

directory. See The lb config command for more information.

• lb build : Responsible for starting a Live system build. See ‹The lb build command› 307

for more information.

• lb clean : Responsible for removing parts of a Live system build. See ‹The lb clean 308

command› for more information.

5.1.1 The lb config command 309

As discussed in ‹live-build›, the scripts that make up live-build read their configuration 310

with the source command from a single directory named config/. As constructing thisdirectory by hand would be time-consuming and error-prone, the lb config commandcan be used to create the initial skeleton configuration tree.

The lb config command creates the following directories inside config/: hooks/, 311

includes/, several other includes subdirectories for each stage of the build process

27

SiSU: - Manualul Live Systemscomplete.sisudoc.org/manual/pdf/live-manual.portrait.ro.a4.pdf· ManualulLiveSystems ProiectulLiveSystems Copyright©2006-2014LiveSystemsProject - [PDF Document] (36)

Manualul Live Systems

and package-lists/. The latter includes a list of several important live packages likelive-boot, live-config and live-config-sysvinit.

Issuing lb config without any arguments completes the config/ subdirectory which 312

it populates with some default settings in configuration files, and two skeleton treesnamed auto/ and local/.

313

$ lb config[2014-04-25 17:14:34] lb configP: Updating config tree for a debian/wheezy/i386 system

Using lb config without any arguments would be suitable for users who need a very 314

basic image, or who intend to provide a more complete configuration via auto/config

later (see ‹Managing a configuration› for details).

Normally, you will want to specify some options. For example, to specify which package 315

manager to use while building the image:

316

$ lb config --apt aptitude

It is possible to specify many options, such as: 317

318

$ lb config --binary-images netboot --bootappend-live "boot=live components hostname=live-host username=live-←↩user" ...

A full list of options is available in the lb_config man page. 319

5.1.2 The lb build command 320

The lb build command reads in your configuration from the config/ directory. It then 321

runs the lower level commands needed to build your Live system.

5.1.3 The lb clean command 322

It is the job of the lb clean command to remove various parts of a build so subsequent 323

builds can start from a clean state. By default, chroot, binary and source stagesare cleaned, but the cache is left intact. Also, individual stages can be cleaned. Forexample, if you have made changes that only affect the binary stage, use lb clean

--binary prior to building a new binary. If your changes invalidate the bootstrap and/orpackage caches, e.g. changes to --mode, --architecture, or --bootstrap, you mustuse lb clean --purge. See the lb_clean man page for a full list of options.

28

SiSU: - Manualul Live Systemscomplete.sisudoc.org/manual/pdf/live-manual.portrait.ro.a4.pdf· ManualulLiveSystems ProiectulLiveSystems Copyright©2006-2014LiveSystemsProject - [PDF Document] (37)

Manualul Live Systems

5.2 The live-boot package 324

live-boot is a collection of scripts providing hooks for the initramfs-tools, used to generate 325

an initramfs capable of booting live systems, such as those created by live-build. Thisincludes the live system ISOs, netboot tarballs, and USB stick images.

At boot time it will look for read-only media containing a /live/ directory where a root 326

filesystem (often a compressed filesystem image like squashfs) is stored. If found, it willcreate a writable environment, using aufs, for Debian like systems to boot from.

More information on initial ramfs in Debian can be found in the Debian Linux Kernel 327

Handbook at ‹http://kernel-handbook.alioth.debian.org/› in the chapter on initramfs.

5.3 The live-config package 328

live-config consists of the scripts that run at boot time after live-boot to configure the 329

live system automatically. It handles such tasks as setting the hostname, locales andtimezone, creating the live user, inhibiting cron jobs and performing autologin of the liveuser.

29

SiSU: - Manualul Live Systemscomplete.sisudoc.org/manual/pdf/live-manual.portrait.ro.a4.pdf· ManualulLiveSystems ProiectulLiveSystems Copyright©2006-2014LiveSystemsProject - [PDF Document] (38)

Manualul Live Systems

Managing a configuration 330

6. Managing a configuration 331

This chapter explains how to manage a live configuration from initial creation, through 332

successive revisions and successive releases of both the live-build software and thelive image itself.

6.1 Dealing with configuration changes 333

Live configurations rarely are perfect on the first try. It may be fine to pass lb config 334

options from the command-line to perform a single build, but it is more typical to revisethose options and build again until you are satisfied. To support these changes, you willneed auto scripts which ensure your configuration is kept in a consistent state.

6.1.1 Why use auto scripts? What do they do? 335

The lb config command stores the options you pass to it in config/* files along with 336

many other options set to default values. If you run lb config again, it will not resetany option that was defaulted based on your initial options. So, for example, if you runlb config again with a new value for --binary-images, any dependent options thatwere defaulted for the old image type may no longer work with the new ones. Nor arethese files intended to be read or edited. They store values for over a hundred options,so nobody, let alone yourself, will be able to see in these which options you actuallyspecified. And finally, if you run lb config, then upgrade live-build and it happens torename an option, config/* would still contain variables named after the old option thatare no longer valid.

For all these reasons, auto/* scripts will make your life easier. They are simple 337

wrappers to the lb config, lb build and lb clean commands that are designed tohelp you manage your configuration. The auto/config script stores your lb config

command with all desired options, the auto/clean script removes the files containingconfiguration variable values, and the auto/build script keeps a build.log of eachbuild. Each of these scripts is run automatically every time you run the correspondinglb command. By using these scripts, your configuration is easier to read and is keptinternally consistent from one revision to the next. Also, it will be much easier for youidentify and fix options which need to change when you upgrade live-build after readingthe updated documentation.

6.1.2 Use example auto scripts 338

For your convenience, live-build comes with example auto shell scripts to copy and edit. 339

Start a new, default configuration, then copy the examples into it:

340

30

SiSU: - Manualul Live Systemscomplete.sisudoc.org/manual/pdf/live-manual.portrait.ro.a4.pdf· ManualulLiveSystems ProiectulLiveSystems Copyright©2006-2014LiveSystemsProject - [PDF Document] (39)

Manualul Live Systems

$ mkdir mylive && cd mylive && lb config$ mkdir auto$ cp /usr/share/doc/live-build/examples/auto/* auto/

Edit auto/config, adding any options as you see fit. For instance: 341

342

#!/bin/shlb config noauto \

--architectures i386 \--linux-flavours 686-pae \--binary-images hdd \--mirror-bootstrap http://ftp.ch.debian.org/debian/ \--mirror-binary http://ftp.ch.debian.org/debian/ \"${@}"

Now, each time you use lb config, auto/config will reset the configuration based on 343

these options. When you want to make changes to them, edit the options in this fileinstead of passing them to lb config. When you use lb clean, auto/clean will cleanup the config/* files along with any other build products. And finally, when you use lb

build, a log of the build will be written by auto/build in build.log.

Note: A special noauto parameter is used here to suppress another call to auto/config, 344

thereby preventing infinite recursion. Make sure you don’t accidentally remove it whenmaking edits. Also, take care to ensure when you split the lb config command acrossmultiple lines for readability, as shown in the example above, that you don’t forget thebackslash ( at the end of each line that continues to the next.

6.2 Clone a configuration published via Git 345

Use the lb config --config option to clone a Git repository that contains a live system 346

configuration. If you would like to base your configuration on one maintained by theLive Systems Project, look at ‹http://live-systems.org/gitweb/› for the repository named live-

images in the category Packages. This repository contains the configurations for thelive systems ‹prebuilt images›.

For example, to build a rescue image, use the live-images repository as follows: 347

348

$ mkdir live-images && cd live-images$ lb config --config git://live-systems.org/git/live-images.git$ cd images/rescue

Edit auto/config and any other things you need in the config tree to suit your needs. 349

For example, the unofficial non-free prebuilt images are made by simply adding --

archive-areas “main contrib non-free”.

You may optionally define a shortcut in your Git configuration by adding the following 350

31

SiSU: - Manualul Live Systemscomplete.sisudoc.org/manual/pdf/live-manual.portrait.ro.a4.pdf· ManualulLiveSystems ProiectulLiveSystems Copyright©2006-2014LiveSystemsProject - [PDF Document] (40)

Manualul Live Systems

to your ${HOME}/.gitconfig:

351

[url "git://live-systems.org/git/"]insteadOf = lso:

This enables you to use lso: anywhere you need to specify the address of a live- 352

systems.org git repository. If you also drop the optional .git suffix, starting a newimage using this configuration is as easy as:

353

$ lb config --config lso:live-images

Cloning the entire live-images repository pulls the configurations used for several 354

images. If you feel like building a different image after you have finished with the firstone, change to another directory and again and optionally, make any changes to suityour needs.

In any case, remember that every time you will have to build the image as superuser: 355

lb build

32

SiSU: - Manualul Live Systemscomplete.sisudoc.org/manual/pdf/live-manual.portrait.ro.a4.pdf· ManualulLiveSystems ProiectulLiveSystems Copyright©2006-2014LiveSystemsProject - [PDF Document] (41)

Manualul Live Systems

Customizing contents 356

7. Customization overview 357

This chapter gives an overview of the various ways in which you may customize a live 358

system.

7.1 Build time vs. boot time configuration 359

Live system configuration options are divided into build-time options which are options 360

that are applied at build time and boot-time options which are applied at boot time.Boot-time options are further divided into those occurring early in the boot, applied bythe live-boot package, and those that happen later in the boot, applied by live-config.Any boot-time option may be modified by the user by specifying it at the boot prompt.The image may also be built with default boot parameters so users can normally justboot directly to the live system without specifying any options when all of the defaultsare suitable. In particular, the argument to lb --bootappend-live consists of anydefault kernel command line options for the Live system, such as persistence, keyboardlayouts, or timezone. See ‹Customizing locale and language›, for example.

Build-time configuration options are described in the lb config man pages. Boot- 361

time options are described in the man pages for live-boot and live-config. Althoughthe live-boot and live-config packages are installed within the live system you arebuilding, it is recommended that you also install them on your build system for easyreference when you are working on your configuration. It is safe to do so, as none ofthe scripts contained within them are executed unless the system is configured as alive system.

7.2 Stages of the build 362

The build process is divided into stages, with various customizations applied in sequence 363

in each. The first stage to run is the bootstrap stage. This is the initial phase ofpopulating the chroot directory with packages to make a barebones Debian system.This is followed by the chroot stage, which completes the construction of chrootdirectory, populating it with all of the packages listed in the configuration, along withany other materials. Most customization of content occurs in this stage. The final stageof preparing the live image is the binary stage, which builds a bootable image, using thecontents of the chroot directory to construct the root filesystem for the Live system, andincluding the installer and any other additional material on the target medium outside ofthe Live system’s filesystem. After the live image is built, if enabled, the source tarballis built in the source stage.

Within each of these stages, there is a particular sequence in which commands are 364

applied. These are arranged in such a way as to ensure customizations can be layered

33

SiSU: - Manualul Live Systemscomplete.sisudoc.org/manual/pdf/live-manual.portrait.ro.a4.pdf· ManualulLiveSystems ProiectulLiveSystems Copyright©2006-2014LiveSystemsProject - [PDF Document] (42)

Manualul Live Systems

in a reasonable fashion. For example, within the chroot stage, preseeds are appliedbefore any packages are installed, packages are installed before any locally includedfiles are copied, and hooks are run later, after all of the materials are in place.

7.3 Supplement lb config with files 365

Although lb config creates a skeletal configuration in the config/ directory, to accomplish366your goals, you may need to provide additional files in subdirectories of config/.Depending on where the files are stored in the configuration, they may be copied intothe live system’s filesystem or into the binary image filesystem, or may provide build-time configurations of the system that would be cumbersome to pass as command-lineoptions. You may include things such as custom lists of packages, custom artwork, orhook scripts to run either at build time or at boot time, boosting the already considerableflexibility of debian-live with code of your own.

7.4 Customization tasks 367

The following chapters are organized by the kinds of customization task users typically 368

perform: ‹Customizing package installation›, ‹Customizing contents› and ‹Customizinglocale and language› cover just a few of the things you might want to do.

34

SiSU: - Manualul Live Systemscomplete.sisudoc.org/manual/pdf/live-manual.portrait.ro.a4.pdf· ManualulLiveSystems ProiectulLiveSystems Copyright©2006-2014LiveSystemsProject - [PDF Document] (43)

Manualul Live Systems

Customizing package installation 369

8. Customizing package installation 370

Perhaps themost basic customization of a live system is the selection of packages to be 371

included in the image. This chapter guides you through the various build-time optionsto customize live-build’s installation of packages. The broadest choices influencingwhich packages are available to install in the image are the distribution and archiveareas. To ensure decent download speeds, you should choose a nearby distributionmirror. You can also add your own repositories for backports, experimental or custompackages, or include packages directly as files. You can define lists of packages,including metapackages which will install many related packages at once, such aspackages for a particular desktop or language. Finally, a number of options give somecontrol over apt, or if you prefer, aptitude, at build timewhen packages are installed. Youmay find these handy if you use a proxy, want to disable installation of recommendedpackages to save space, or need to control which versions of packages are installedvia APT pinning, to name a few possibilities.

8.1 Package sources 372

8.1.1 Distribution, archive areas and mode 373

The distribution you choose has the broadest impact on which packages are available 374

to include in your live image. Specify the codename, which defaults to jessie for thejessie version of live-build. Any current distribution carried in the archive may bespecified by its codename here. (See ‹Terms› for more details.) The --distribution

option not only influences the source of packages within the archive, but also instructslive-build to behave as needed to build each supported distribution. For example, tobuild against the unstable release, sid , specify:

375

$ lb config --distribution sid

Within the distribution archive, archive areas are major divisions of the archive. In 376

Debian, these are main, contrib and non-free. Only main contains software that ispart of the Debian distribution, hence that is the default. One or more values may bespecified, e.g.

377

$ lb config --archive-areas "main contrib non-free"

Experimental support is available for some Debian derivatives through a --mode option. 378

By default, this option is set to debian only if you are building on a Debian or on an

35

SiSU: - Manualul Live Systemscomplete.sisudoc.org/manual/pdf/live-manual.portrait.ro.a4.pdf· ManualulLiveSystems ProiectulLiveSystems Copyright©2006-2014LiveSystemsProject - [PDF Document] (44)

Manualul Live Systems

unknown system. If lb config is invoked on any of the supported derivatives, it willdefault to create an image of that derivative. If lb config is run in e.g. ubuntu mode,the distribution names and archive areas for the specified derivative are supportedinstead of the ones for Debian. The mode also modifies live-build behaviour to suitthe derivatives.

Note: The projects for whom these modes were added are primarily responsible 379

for supporting users of these options. The Live Systems Project, in turn, providesdevelopment support on a best-effort basis only, based on feedback from the derivativeprojects as we do not develop or support these derivatives ourselves.

8.1.2 Distribution mirrors 380

The Debian archive is replicated across a large network of mirrors around the world 381

so that people in each region can choose a nearby mirror for best download speed.Each of the --mirror-* options governs which distribution mirror is used at variousstages of the build. Recall from ‹Stages of the build› that the bootstrap stage is whenthe chroot is initially populated by debootstrap with a minimal system, and the chrootstage is when the chroot used to construct the live system’s filesystem is built. Thus, thecorresponding mirror switches are used for those stages, and later, in the binary stage,the --mirror-binary and --mirror-binary-security values are used, supersedingany mirrors used in an earlier stage.

8.1.3 Distribution mirrors used at build time 382

To set the distribution mirrors used at build time to point at a local mirror, it is sufficient to 383

set --mirror-bootstrap, --mirror-chroot-security and --mirror-chroot-backportsas follows.

384

$ lb config --mirror-bootstrap http://localhost/debian/ \--mirror-chroot-security http://localhost/debian-security/ \--mirror-chroot-backports http://localhost/debian-backports/

The chroot mirror, specified by --mirror-chroot, defaults to the --mirror-bootstrap 385

value.

8.1.4 Distribution mirrors used at run time 386

The --mirror-binary* options govern the distribution mirrors placed in the binary 387

image. These may be used to install additional packages while running the live system.The defaults employ http.debian.net, a service that chooses a geographically closemirror based, among other things, on the user’s IP family and the availability of themirrors. This is a suitable choice when you cannot predict which mirror will be best for

36

SiSU: - Manualul Live Systemscomplete.sisudoc.org/manual/pdf/live-manual.portrait.ro.a4.pdf· ManualulLiveSystems ProiectulLiveSystems Copyright©2006-2014LiveSystemsProject - [PDF Document] (45)

Manualul Live Systems

all of your users. Or you may specify your own values as shown in the example below.An image built from this configuration would only be suitable for users on a networkwhere “mirror” is reachable.

388

$ lb config --mirror-binary http://mirror/debian/ \--mirror-binary-security http://mirror/debian-security/ \--mirror-binary-backports http://mirror/debian-backports/

8.1.5 Additional repositories 389

You may add more repositories, broadening your package choices beyond what is 390

available in your target distribution. Thesemay be, for example, for backports, experimentalor custom packages. To configure additional repositories, create config/archives/-

your-repository.list.chroot, and/or config/archives/your-repository.list.binaryfiles. As with the --mirror-* options, these govern the repositories used in the chrootstage when building the image, and in the binary stage, i.e. for use when running thelive system.

For example, config/archives/live.list.chroot allows you to install packages from 391

the debian-live snapshot repository at live system build time.

392

deb http://live-systems.org/ sid-snapshots main contrib non-free

If you add the same line to config/archives/live.list.binary, the repository will be 393

added to your live system’s /etc/apt/sources.list.d/ directory.

If such files exist, they will be picked up automatically. 394

You should also put the GPG key used to sign the repository into config/archives/- 395

your-repository.key.{binary,chroot} files.

Should you need custom APT pinning, such APT preferences snippets can be placed in 396

config/archives/your-repository.pref.{binary,chroot} files andwill be automaticallyadded to your live system’s /etc/apt/preferences.d/ directory.

8.2 Choosing packages to install 397

There are a number of ways to choose which packages live-build will install in your 398

image, covering a variety of different needs. You can simply name individual packagesto install in a package list. You can also use metapackages in those lists, or selectthem using package control file fields. And finally, you may place package files in yourconfig/ tree, which is well suited to testing of new or experimental packages beforethey are available from a repository.

37

SiSU: - Manualul Live Systemscomplete.sisudoc.org/manual/pdf/live-manual.portrait.ro.a4.pdf· ManualulLiveSystems ProiectulLiveSystems Copyright©2006-2014LiveSystemsProject - [PDF Document] (46)

Manualul Live Systems

8.2.1 Package lists 399

Package lists are a powerful way of expressing which packages should be installed. 400

The list syntax supports conditional sections which makes it easy to build lists andadapt them for use in multiple configurations. Package names may also be injectedinto the list using shell helpers at build time.

Note: The behaviour of live-build when specifying a package that does not exist is 401

determined by your choice of APT utility. See ‹Choosing apt or aptitude› for moredetails.

8.2.2 Using metapackages 402

The simplest way to populate your package list is to use a taskmetapackagemaintained 403

by your distribution. For example:

404

$ lb config$ echo task-gnome-desktop > config/package-lists/desktop.list.chroot

This supercedes the older predefined list method supported in live-build 2.x. Unlike 405

predefined lists, taskmetapackages are not specific to the Live System project. Instead,they are maintained by specialist working groups within the distribution and thereforereflect the consensus of each group about which packages best serve the needs ofthe intended users. They also cover a much broader range of use cases than thepredefined lists they replace.

All task metapackages are prefixed task-, so a quick way to determine which are 406

available (though it may contain a handful of false hits that match the name but aren’tmetapackages) is to match on the package name with:

407

$ apt-cache search --names-only ^task-

In addition to these, you will find other metapackages with various purposes. Some 408

are subsets of broader task packages, like gnome-core, while others are individualspecialized parts of a Debian Pure Blend, such as the education-* metapackages. Tolist all metapackages in the archive, install the debtags package and list all packageswith the role::metapackage tag as follows:

409

$ debtags search role::metapackage

38

SiSU: - Manualul Live Systemscomplete.sisudoc.org/manual/pdf/live-manual.portrait.ro.a4.pdf· ManualulLiveSystems ProiectulLiveSystems Copyright©2006-2014LiveSystemsProject - [PDF Document] (47)

Manualul Live Systems

8.2.3 Local package lists 410

Whether you list metapackages, individual packages, or a combination of both, all local 411

package lists are stored in config/package-lists/. Since more than one list can beused, this lends itself well to modular designs. For example, you may decide to devoteone list to a particular choice of desktop, another to a collection of related packages thatmight as easily be used on top of a different desktop. This allows you to experiment withdifferent combinations of sets of packages with aminimum of fuss, sharing common listsbetween different live image projects.

Package lists that exist in this directory need to have a .list suffix in order to be 412

processed, and then an additional stage suffix, .chroot or .binary to indicate whichstage the list is for.

Note: If you don’t specify the stage suffix, the list will be used for both stages. Normally, 413

you want to specify .list.chroot so that the packages will only be installed in the livefilesystem and not have an extra copy of the .deb placed on the medium.

8.2.4 Local binary package lists 414

To make a binary stage list, place a file suffixed with .list.binary in config/package- 415

lists/. These packages are not installed in the live filesystem, but are included on thelive medium under pool/. You would typically use such a list with one of the non-liveinstaller variants. As mentioned above, if you want this list to be the same as yourchroot stage list, simply use the .list suffix by itself.

8.2.5 Generated package lists 416

It sometimes happens that the best way to compose a list is to generate it with a script. 417

Any line starting with an exclamation point indicates a command to be executed withinthe chroot when the image is built. For example, one might include the line ! grep-

aptavail -n -sPackage -FPriority standard |sort in a package list to produce asorted list of available packages with Priority: standard.

In fact, selecting packages with the grep-aptavail command (from the dctrl-tools 418

package) is so useful that live-build provides a Packages helper script as a convenience.This script takes two arguments: field and pattern. Thus, you can create a list withthe following contents:

419

$ lb config$ echo '! Packages Priority standard' > config/package-lists/standard.list.chroot

39

SiSU: - Manualul Live Systemscomplete.sisudoc.org/manual/pdf/live-manual.portrait.ro.a4.pdf· ManualulLiveSystems ProiectulLiveSystems Copyright©2006-2014LiveSystemsProject - [PDF Document] (48)

Manualul Live Systems

8.2.6 Using conditionals inside package lists 420

Any of the live-build configuration variables stored in config/* (minus the LB_ prefix) 421

may be used in conditional statements in package lists. Generally, this means any lb

config option uppercased and with dashes changed to underscores. But in practice, itis only the ones that influence package selection that make sense, such as DISTRIBUTION,ARCHITECTURES or ARCHIVE_AREAS.

For example, to install ia32-libs if the --architectures amd64 is specified: 422

423

#if ARCHITECTURES amd64ia32-libs#endif

You may test for any one of a number of values, e.g. to install memtest86+ if either 424

--architectures i386 or --architectures amd64 is specified:

425

#if ARCHITECTURES i386 amd64memtest86+#endif

Youmay also test against variables that may contain more than one value, e.g. to install 426

vrms if either contrib or non-free is specified via --archive-areas:

427

#if ARCHIVE_AREAS contrib non-freevrms#endif

The nesting of conditionals is not supported. 428

8.2.7 Removing packages at install time 429

You can list packages in files with .list.chroot_live and .list.chroot_install 430

suffixes inside the config/package-lists directory. If both a live and an install listexist, the packages in the .list.chroot_live list are removed with a hook after theinstallation (if the user uses the installer). The packages in the .list.chroot_install

list are present both in the live system and in the installed system. This is a specialtweak for the installer and may be useful if you have --debian-installer live set inyour config, and wish to remove live system-specific packages at install time.

40

SiSU: - Manualul Live Systemscomplete.sisudoc.org/manual/pdf/live-manual.portrait.ro.a4.pdf· ManualulLiveSystems ProiectulLiveSystems Copyright©2006-2014LiveSystemsProject - [PDF Document] (49)

Manualul Live Systems

8.2.8 Desktop and language tasks 431

Desktop and language tasks are special cases that need some extra planning and 432

configuration. Live images are different from Debian Installer images in this respect. Inthe Debian Installer, if the medium was prepared for a particular desktop environmentflavour, the corresponding task will be automatically installed. Thus, there are internalgnome-desktop, kde-desktop, lxde-desktop and xfce-desktop tasks, none of whichare offered in tasksel’s menu. Likewise, there are no menu entries for tasks forlanguages, but the user’s language choice during the install influences the selectionof corresponding language tasks.

When developing a desktop live image, the image typically boots directly to a working 433

desktop, the choices of both desktop and default language having been made at buildtime, not at run time as in the case of the Debian Installer. That’s not to say that a liveimage couldn’t be built to support multiple desktops or multiple languages and offer theuser a choice, but that is not live-build’s default behaviour.

Because there is no provision made automatically for language tasks, which include 434

such things as language-specific fonts and input-method packages, if you want them,you need to specify them in your configuration. For example, a GNOME desktop imagecontaining support for German might include these task metapackages:

435

$ lb config$ echo "task-gnome-desktop task-laptop" >> config/package-lists/my.list.chroot$ echo "task-german task-german-desktop task-german-gnome-desktop" >> config/package-lists/my.list.chroot

8.2.9 Kernel flavour and version 436

One or more kernel flavours will be included in your image by default, depending on the 437

architecture. You can choose different flavours via the --linux-flavours option. Eachflavour is suffixed to the default stub linux-image to form each metapackage namewhich in turn depends on an exact kernel package to be included in your image.

Thus by default, an amd64 architecture image will include the linux-image-amd64 flavour 438

metapackage, and an i386 architecture image will include the linux-image-486 andlinux-image-686-pae metapackages. At time of writing, these packages depend onlinux-image-3.2.0-4-amd64, linux-image-3.2.0-4-486 and linux-image-3.2.0-4-

686-pae, respectively.

When more than one kernel package version is available in your configured archives, 439

you can specify a different kernel package name stub with the --linux-packages

option. For example, supposing you are building an amd64 architecture image and addthe experimental archive for testing purposes so you can install the linux-image-3.7-

trunk-amd64 kernel. You would configure that image as follows:

440

41

SiSU: - Manualul Live Systemscomplete.sisudoc.org/manual/pdf/live-manual.portrait.ro.a4.pdf· ManualulLiveSystems ProiectulLiveSystems Copyright©2006-2014LiveSystemsProject - [PDF Document] (50)

Manualul Live Systems

$ lb config --linux-packages linux-image-3.7-trunk$ echo "deb http://ftp.debian.org/debian/ experimental main" > config/archives/experimental.list.chroot

8.2.10 Custom kernels 441

You can build and include your own custom kernels, so long as they are integrated within 442

the Debian package management system. The live-build system does not supportkernels not built as .deb packages.

The proper and recommended way to deploy your own kernel packages is to follow the 443

instructions in the kernel-handbook. Remember to modify the ABI and flavour suffixesappropriately, then include a complete build of the linux and matching linux-latest

packages in your repository.

If you opt to build the kernel packages without the matching metapackages, you need 444

to specify an appropriate --linux-packages stub as discussed in ‹Kernel flavour andversion›. As we explain in ‹Installing modified or third-party packages›, it is best if youinclude your custom kernel packages in your own repository, though the alternativesdiscussed in that section work as well.

It is beyond the scope of this document to give advice on how to customize your 445

kernel. However, you must at least ensure your configuration satisfies these minimumrequirements:

• Use an initial ramdisk. 446

• Include the union filesystem module (i.e. usually aufs). 447

• Include any other filesystem modules required by your configuration (i.e. usually 448

squashfs).

8.3 Installing modified or third-party packages 449

While it is against the philosophy of a live system, it may sometimes be necessary to 450

build a live system with modified versions of packages that are in the Debian repository.This may be to modify or support additional features, languages and branding, or evento remove elements of existing packages that are undesirable. Similarly, “third-party”packages may be used to add bespoke and/or proprietary functionality.

This section does not cover advice regarding building ormaintainingmodified packages. 451

JoachimBreitner’s ‘How to fork privately’ method from ‹http://www.joachim-breitner.de/blog/archives/282-How-to-fork-privately.html› may be of interest, however. The creation of bespoke packagesis covered in the Debian New Maintainers’ Guide at ‹http://www.debian.org/doc/maint-guide/› andelsewhere.

There are two ways of installing modified custom packages: 452

• packages.chroot 453

42

SiSU: - Manualul Live Systemscomplete.sisudoc.org/manual/pdf/live-manual.portrait.ro.a4.pdf· ManualulLiveSystems ProiectulLiveSystems Copyright©2006-2014LiveSystemsProject - [PDF Document] (51)

Manualul Live Systems

• Using a custom APT repository 454

Using packages.chroot is simpler to achieve and useful for “one-off” customizations 455

but has a number of drawbacks, while using a custom APT repository is more time-consuming to set up.

8.3.1 Using packages.chroot to install custom packages 456

To install a custom package, simply copy it to the config/packages.chroot/ directory. 457

Packages that are inside this directory will be automatically installed into the live systemduring build - you do not need to specify them elsewhere.

Packages must be named in the prescribed way. One simple way to do this is to use 458

dpkg-name.

Using packages.chroot for installation of custom packages has disadvantages: 459

• It is not possible to use secure APT. 460

• You must install all appropriate packages in the config/packages.chroot/ directory. 461

• It does not lend itself to storing live system configurations in revision control. 462

8.3.2 Using an APT repository to install custom packages 463

Unlike using packages.chroot, when using a custom APT repository you must ensure 464

that you specify the packages elsewhere. See ‹Choosing packages to install› fordetails.

While it may seem unnecessary effort to create an APT repository to install custom 465

packages, the infrastructure can be easily re-used at a later date to offer updates of themodified packages.

8.3.3 Custom packages and APT 466

live-build uses APT to install all packages into the live system so will therefore inherit 467

behaviours from this program. One relevant example is that (assuming a defaultconfiguration) given a package available in two different repositories with differentversion numbers, APTwill elect to install the packagewith the higher version number.

Because of this, youmaywish to increment the version number in your custom packages’ 468

debian/changelog files to ensure that your modified version is installed over one in theofficial Debian repositories. This may also be achieved by altering the live system’sAPT pinning preferences - see ‹APT pinning› for more information.

43

SiSU: - Manualul Live Systemscomplete.sisudoc.org/manual/pdf/live-manual.portrait.ro.a4.pdf· ManualulLiveSystems ProiectulLiveSystems Copyright©2006-2014LiveSystemsProject - [PDF Document] (52)

Manualul Live Systems

8.4 Configuring APT at build time 469

You can configure APT through a number of options applied only at build time. (APT 470

configuration used in the running live system may be configured in the normal wayfor live system contents, that is, by including the appropriate configurations throughconfig/includes.chroot/.) For a complete list, look for options starting with apt in thelb_config man page.

8.4.1 Choosing apt or aptitude 471

You can elect to use either apt or aptitudewhen installing packages at build time. Which 472

utility is used is governed by the --apt argument to lb config. Choose the methodimplementing the preferred behaviour for package installation, the notable differencebeing how missing packages are handled.

• apt: With this method, if a missing package is specified, the package installation will 473

fail. This is the default setting.

• aptitude: With thismethod, if amissing package is specified, the package installation 474

will succeed.

8.4.2 Using a proxy with APT 475

One commonly required APT configuration is to deal with building an image behind a 476

proxy. Youmay specify your APT proxy with the --apt-ftp-proxy or --apt-http-proxyoptions as needed, e.g.

477

$ lb config --apt-http-proxy http://proxy/

8.4.3 Tweaking APT to save space 478

You may find yourself needing to save some space on the image medium, in which 479

case one or the other or both of the following options may be of interest.

If you don’t want to include APT indices in the image, you can omit those with: 480

481

$ lb config --apt-indices false

This will not influence the entries in /etc/apt/sources.list, but merely whether /- 482

var/lib/apt contains the indices files or not. The tradeoff is that APT needs thoseindices in order to operate in the live system, so before performing apt-cache search

44

SiSU: - Manualul Live Systemscomplete.sisudoc.org/manual/pdf/live-manual.portrait.ro.a4.pdf· ManualulLiveSystems ProiectulLiveSystems Copyright©2006-2014LiveSystemsProject - [PDF Document] (53)

Manualul Live Systems

or apt-get install, for instance, the user must apt-get update first to create thoseindices.

If you find the installation of recommended packages bloats your image too much, 483

provided you are prepared to deal with the consequences discussed below, you maydisable that default option of APT with:

484

$ lb config --apt-recommends false

The most important consequence of turning off recommends is that live-boot and 485

live-config themselves recommend some packages that provide important functionalityused bymost Live configurations, such as user-setupwhich live-config recommendsand is used to create the live user. In all but the most exceptional circ*mstances youneed to add back at least some of these recommends to your package lists or else yourimage will not work as expected, if at all. Look at the recommended packages for eachof the live-* packages included in your build and if you are not certain you can omitthem, add them back into your package lists.

The more general consequence is that if you don’t install recommended packages for 486

any given package, that is, “packages that would be found together with this one inall but unusual installations” (Debian Policy Manual, section 7.2), some packages thatusers of your Live system actually need may be omitted. Therefore, we suggest youreview the difference turning off recommends makes to your packages list (see thebinary.packages file generated by lb build) and re-include in your list any missingpackages that you still want installed. Alternatively, if you find you only want a smallnumber of recommended packages left out, leave recommends enabled and set anegative APT pin priority on selected packages to prevent them from being installed,as explained in ‹APT pinning›.

8.4.4 Passing options to apt or aptitude 487

If there is not a lb config option to alter APT’s behaviour in the way you need, use 488

--apt-options or --aptitude-options to pass any options through to your configuredAPT tool. See the man pages for apt and aptitude for details. Note that both optionshave default values that you will need to retain in addition to any overrides you mayprovide. So, for example, suppose you have included something from snapshot.debian.org

for testing purposes and want to specify Acquire::Check-Valid-Until=false to makeAPT happy with the stale Release file, you would do so as per the following example,appending the new option after the default value --yes:

489

$ lb config --apt-options "--yes -oAcquire::Check-Valid-Until=false"

45

SiSU: - Manualul Live Systemscomplete.sisudoc.org/manual/pdf/live-manual.portrait.ro.a4.pdf· ManualulLiveSystems ProiectulLiveSystems Copyright©2006-2014LiveSystemsProject - [PDF Document] (54)

Manualul Live Systems

Please check the man pages to fully understand these options and when to use them. 490

This is an example only and should not be construed as advice to configure yourimage this way. This option would not be appropriate for, say, a final release of alive image.

For more complicated APT configurations involving apt.conf options you might want 491

to create a config/apt/apt.conf file instead. See also the other apt-* options for afew convenient shortcuts for frequently needed options.

8.4.5 APT pinning 492

For background, please first read the apt_preferences(5)man page. APT pinning can 493

be configured either for build time, or else for run time. For the former, create config/-

archives/*.pref, config/archives/*.pref.chroot, and config/apt/preferences.-For the latter, create config/includes.chroot/etc/apt/preferences.

Let’s say you are building a jessie live system but need all the live packages that end 494

up in the binary image to be installed from sid at build time. You need to add sid toyour APT sources and pin the live packages from it higher, but all other packages fromit lower, than the default priority. Thus, only the packages you want are installed fromsid at build time and all others are taken from the target system distribution, jessie .The following will accomplish this:

495

$ echo "deb http://mirror/debian/ sid main" > config/archives/sid.list.chroot$ cat >> config/archives/sid.pref.chroot << EOFPackage: live-*Pin: release n=sidPin-Priority: 600

Package: *Pin: release n=sidPin-Priority: 1EOF

Negative pin priorities will prevent a package from being installed, as in the case where 496

you do not want a package that is recommended by another package. Suppose youare building an LXDE image using task-lxde-desktop in config/package-lists/-

desktop.list.chroot, but don’t want the user prompted to store wifi passwords in thekeyring. This metapackage depends on lxde-core, which recommends gksu, whichin turn recommends gnome-keyring. So you want to omit the recommended gnome-keyring package. This can be done by adding the following stanza to config/apt/-

preferences:

497

Package: gnome-keyringPin: version *Pin-Priority: -1

46

SiSU: - Manualul Live Systemscomplete.sisudoc.org/manual/pdf/live-manual.portrait.ro.a4.pdf· ManualulLiveSystems ProiectulLiveSystems Copyright©2006-2014LiveSystemsProject - [PDF Document] (55)

Manualul Live Systems

Customizing contents 498

9. Customizing contents 499

This chapter discusses fine-tuning customization of the live system contents beyond 500

merely choosing which packages to include. Includes allow you to add or replacearbitrary files in your live system image, hooks allow you to execute arbitrary commandsat different stages of the build and at boot time, and preseeding allows you to configurepackages when they are installed by supplying answers to debconf questions.

9.1 Includes 501

While ideally a live systemwould include files entirely provided by unmodified packages, 502

it is sometimes convenient to provide or modify some content by means of files. Usingincludes, it is possible to add (or replace) arbitrary files in your live system image. live-build provides two mechanisms for using them:

• Chroot local includes: These allow you to add or replace files to the chroot/Live 503

filesystem. Please see ‹Live/chroot local includes› for more information.

• Binary local includes: These allow you to add or replace files in the binary image. 504

Please see ‹Binary local includes› for more information.

Please see ‹Terms› for more information about the distinction between the “Live” and 505

“binary” images.

9.1.1 Live/chroot local includes 506

Chroot local includes can be used to add or replace files in the chroot/Live filesystem so 507

that they may be used in the Live system. A typical use is to populate the skeleton userdirectory (/etc/skel) used by the Live system to create the live user’s home directory.Another is to supply configuration files that can be simply added or replaced in theimage without processing; see ‹Live/chroot local hooks› if processing is needed.

To include files, simply add them to your config/includes.chroot directory. This 508

directory corresponds to the root directory / of the live system. For example, to add afile /var/www/index.html in the live system, use:

509

$ mkdir -p config/includes.chroot/var/www$ cp /path/to/my/index.html config/includes.chroot/var/www

Your configuration will then have the following layout: 510

511

47

SiSU: - Manualul Live Systemscomplete.sisudoc.org/manual/pdf/live-manual.portrait.ro.a4.pdf· ManualulLiveSystems ProiectulLiveSystems Copyright©2006-2014LiveSystemsProject - [PDF Document] (56)

Manualul Live Systems

-- config[...]|-- includes.chroot| `-- var| `-- www| `-- index.html[...]

Chroot local includes are installed after package installation so that files installed by 512

packages are overwritten.

9.1.2 Binary local includes 513

To include material such as documentation or videos on the medium filesystem so 514

that it is accessible immediately upon insertion of the medium without booting the Livesystem, you can use binary local includes. This works in a similar fashion to chroot localincludes. For example, suppose the files ~/video_demo.* are demo videos of the livesystem described by and linked to by an HTML index page. Simply copy the materialto config/includes.binary/ as follows:

515

$ cp ~/video_demo.* config/includes.binary/

These files will now appear in the root directory of the live medium. 516

9.2 Hooks 517

Hooks allow commands to be performed in the chroot and binary stages of the build in 518

order to customize the image.

9.2.1 Live/chroot local hooks 519

To run commands in the chroot stage, create a hook script with a .hook.chroot suffix 520

containing the commands in the config/hooks/ directory. The hook will run in the chrootafter the rest of your chroot configuration has been applied, so remember to ensure yourconfiguration includes all packages and files your hook needs in order to run. See theexample chroot hook scripts for various common chroot customization tasks providedin /usr/share/doc/live-build/examples/hooks which you can copy or symlink to usethem in your own configuration.

9.2.2 Boot-time hooks 521

To execute commands at boot time, you can supply live-config hooks as explained in 522

the “Customization” section of its man page. Examine live-config’s own hooks provided

48

SiSU: - Manualul Live Systemscomplete.sisudoc.org/manual/pdf/live-manual.portrait.ro.a4.pdf· ManualulLiveSystems ProiectulLiveSystems Copyright©2006-2014LiveSystemsProject - [PDF Document] (57)

Manualul Live Systems

in /lib/live/config/, noting the sequence numbers. Then provide your own hookprefixed with an appropriate sequence number, either as a chroot local include inconfig/includes.chroot/lib/live/config/, or as a custom package as discussedin ‹Installing modified or third-party packages›.

9.2.3 Binary local hooks 523

To run commands in the binary stage, create a hook script with a .hook.binary suffix 524

containing the commands in the config/hooks/ directory. The hook will run after allother binary commands are run, but before binary_checksums, the very last binarycommand. The commands in your hook do not run in the chroot, so take care to notmodify any files outside of the build tree, or youmay damage your build system! See theexample binary hook scripts for various common binary customization tasks providedin /usr/share/doc/live-build/examples/hooks which you can copy or symlink to usethem in your own configuration.

9.3 Preseeding Debconf questions 525

Files in the config/preseed/ directory suffixed with .cfg followed by the stage (.chroot 526

or .binary) are considered to be debconf preseed files and are installed by live-buildusing debconf-set-selections during the corresponding stage.

Formore information about debconf, please see debconf(7) in the debconf package. 527

49

SiSU: - Manualul Live Systemscomplete.sisudoc.org/manual/pdf/live-manual.portrait.ro.a4.pdf· ManualulLiveSystems ProiectulLiveSystems Copyright©2006-2014LiveSystemsProject - [PDF Document] (58)

Manualul Live Systems

Customizing run time behaviours 528

10. Customizing run time behaviours 529

All configuration that is done during run time is done by live-config. Here are some 530

of the most common options of live-config that users are interested in. A full list of allpossibilities can be found in the man page of live-config.

10.1 Customizing the live user 531

One important consideration is that the live user is created by live-boot at boot time, 532

not by live-build at build time. This not only influences where materials relating to thelive user are introduced in your build, as discussed in ‹Live/chroot local includes›, butalso any groups and permissions associated with the live user.

You can specify additional groups that the live user will belong to by using any of the 533

possibilities to configure live-config. For example, to add the live user to the fuse group,you can either add the following file in config/includes.chroot/etc/live/config/-

user-setup.conf:

534

LIVE_USER_DEFAULT_GROUPS="audio cdrom dip floppy video plugdev netdev powerdev scanner bluetooth fuse"

or use live-config.user-default-groups=audio,cdrom,dip,floppy,video,plugdev,netdev,powerdev,scanner,bluetooth,fuse535

as a boot parameter.

It is also possible to change the default username “user” and the default password “live”. 536

If you want to do that for any reason, you can easily achieve it as follows:

To change the default username you can simply specify it in your config: 537

538

$ lb config --bootappend-live "boot=live components username=live-user"

One possible way of changing the default password is by means of a hook as described 539

in ‹Boot-time hooks›. In order to do that you can use the “passwd” hook from /usr/-

share/doc/live-config/examples/hooks, prefix it accordingly (e.g. 2000-passwd) andadd it to config/includes.chroot/lib/live/config/

10.2 Customizing locale and language 540

When the live system boots, language is involved in two steps: 541

• the locale generation 542

50

SiSU: - Manualul Live Systemscomplete.sisudoc.org/manual/pdf/live-manual.portrait.ro.a4.pdf· ManualulLiveSystems ProiectulLiveSystems Copyright©2006-2014LiveSystemsProject - [PDF Document] (59)

Manualul Live Systems

• setting the keyboard configuration 543

The default locale when building a Live system is locales=en_US.UTF-8. To define the 544

locale that should be generated, use the locales parameter in the --bootappend-live

option of lb config, e.g.

545

$ lb config --bootappend-live "boot=live components locales=de_CH.UTF-8"

Multiple locales may be specified as a comma-delimited list. 546

This parameter, as well as the keyboard configuration parameters indicated below, can 547

also be used at the kernel command line. You can specify a locale by language_country(in which case the default encoding is used) or the full language_country.encodingword. A list of supported locales and the encoding for each can be found in /usr/-

share/i18n/SUPPORTED.

Both the console and X keyboard configuration are performed by live-config using 548

the console-setup package. To configure them, use the keyboard-layouts, keyboard-variants, keyboard-options and keyboard-model boot parameters via the --bootappend-live option. Valid options for these can be found in /usr/share/X11/xkb/rules/base.-lst. To find layouts and variants for a given language, try searching for the Englishname of the language and/or the country where the language is spoken, e.g:

549

$ egrep -i '(^!|german.*switzerland)' /usr/share/X11/xkb/rules/base.lst! model! layout

ch German (Switzerland)! variant

legacy ch: German (Switzerland, legacy)de_nodeadkeys ch: German (Switzerland, eliminate dead keys)de_sundeadkeys ch: German (Switzerland, Sun dead keys)de_mac ch: German (Switzerland, Macintosh)

! option

Note that each variant lists the layout to which it applies in the description. 550

Often, only the layout needs to be configured. For example, to get the locale files for 551

German and Swiss German keyboard layout in X use:

552

$ lb config --bootappend-live "boot=live components locales=de_CH.UTF-8 keyboard-layouts=ch"

However, for very specific use cases, you may wish to include other parameters. For 553

example, to set up a French system with a French-Dvorak layout (called Bepo) on aTypeMatrix EZ-Reach 2030 USB keyboard, use:

554

51

SiSU: - Manualul Live Systemscomplete.sisudoc.org/manual/pdf/live-manual.portrait.ro.a4.pdf· ManualulLiveSystems ProiectulLiveSystems Copyright©2006-2014LiveSystemsProject - [PDF Document] (60)

Manualul Live Systems

$ lb config --bootappend-live \"boot=live components locales=fr_FR.UTF-8 keyboard-layouts=fr keyboard-variants=bepo keyboard-model=←↩

tm2030usb"

Multiple values may be specified as comma-delimited lists for each of the keyboard-* 555

options, with the exception of keyboard-model, which accepts only one value. Pleasesee the keyboard(5) man page for details and examples of XKBMODEL, XKBLAYOUT,XKBVARIANT and XKBOPTIONS variables. If multiple keyboard-variants values are given,they will be matched one-to-one with keyboard-layouts values (see setxkbmap(1) -

variant option). Empty values are allowed; e.g. to define two layouts, the default beingUS QWERTY and the other being US Dvorak, use:

556

$ lb config --bootappend-live \"boot=live components keyboard-layouts=us,us keyboard-variants=,dvorak"

10.3 Persistence 557

A live cd paradigm is a pre-installed system which runs from read-only media, like a 558

cdrom, where writes and modifications do not survive reboots of the host hardwarewhich runs it.

A live system is a generalization of this paradigm and thus supports other media in 559

addition to CDs; but still, in its default behaviour, it should be considered read-only andall the run-time evolutions of the system are lost at shutdown.

‘Persistence’ is a common name for different kinds of solutions for saving across reboots 560

some, or all, of this run-time evolution of the system. To understand how it works itwould be handy to know that even if the system is booted and run from read-only media,modifications to the files and directories are written on writable media, typically a ramdisk (tmpfs) and ram disks’ data do not survive reboots.

The data stored on this ramdisk should be saved on a writable persistent medium like 561

local storage media, a network share or even a session of a multisession (re)writableCD/DVD. All these media are supported in live systems in different ways, and all but thelast one require a special boot parameter to be specified at boot time: persistence.

If the boot parameter persistence is set (and nopersistence is not set), local storage 562

media (e.g. hard disks, USB drives) will be probed for persistence volumes during boot.It is possible to restrict which types of persistence volumes to use by specifying certainboot parameters described in the live-boot(7) man page. A persistence volume is anyof the following:

• a partition, identified by its GPT name. 563

• a filesystem, identified by its filesystem label. 564

52

SiSU: - Manualul Live Systemscomplete.sisudoc.org/manual/pdf/live-manual.portrait.ro.a4.pdf· ManualulLiveSystems ProiectulLiveSystems Copyright©2006-2014LiveSystemsProject - [PDF Document] (61)

Manualul Live Systems

• an image file located on the root of any readable filesystem (even an NTFS partition 565

of a foreign OS), identified by its filename.

The volume label for overlays must be persistence but it will be ignored unless it 566

contains in its root a file named persistence.conf which is used to fully customizethe volume’s persistence, this is to say, specifying the directories that you want to savein your persistence volume after a reboot. See ‹The persistence.conf file› for moredetails.

Here are some examples of how to prepare a volume to be used for persistence. It can 567

be, for instance, an ext4 partition on a hard disk or on a usb key created with, e.g.:

568

# mkfs.ext4 -L persistence /dev/sdb1

See also ‹Using the space left on a USB stick›. 569

If you already have a partition on your device, you could just change the label with one 570

of the following:

571

# tune2fs -L persistence /dev/sdb1 # for ext2,3,4 filesystems

Here’s an example of how to create an ext4-based image file to be used for persistence: 572

573

$ dd if=/dev/null of=persistence bs=1 count=0 seek=1G # for a 1GB sized image file$ /sbin/mkfs.ext4 -F persistence

Once the image file is created, as an example, to make /usr persistent but only saving 574

the changes you make to that directory and not all the contents of /usr, you can usethe “union” option. If the image file is located in your home directory, copy it to the rootof your hard drive’s filesystem and mount it in /mnt as follows:

575

# cp persistence /# mount -t ext4 /persistence /mnt

Then, create the persistence.conf file adding content and unmount the image file. 576

577

# echo "/usr union" >> /mnt/persistence.conf# umount /mnt

Now, reboot into your live medium with the boot parameter “persistence”. 578

53

SiSU: - Manualul Live Systemscomplete.sisudoc.org/manual/pdf/live-manual.portrait.ro.a4.pdf· ManualulLiveSystems ProiectulLiveSystems Copyright©2006-2014LiveSystemsProject - [PDF Document] (62)

Manualul Live Systems

10.3.1 The persistence.conf file 579

A volumewith the label persistencemust be configured bymeans of the persistence.conf580file to make arbitrary directories persistent. That file, located on the volume’s filesystemroot, controls which directories it makes persistent, and in which way.

How custom overlaymounts are configured is described in full detail in the persistence.conf(5)581

man page, but a simple example should be sufficient for most uses. Let’s say we wantto make our home directory and APT cache persistent in an ext4 filesystem on the/dev/sdb1 partition:

582

# mkfs.ext4 -L persistence /dev/sdb1# mount -t ext4 /dev/sdb1 /mnt# echo "/home" >> /mnt/persistence.conf# echo "/var/cache/apt" >> /mnt/persistence.conf# umount /mnt

Then we reboot. During the first boot the contents of /home and /var/cache/apt 583

will be copied into the persistence volume, and from then on all changes to thesedirectories will live in the persistence volume. Please note that any paths listed inthe persistence.conf file cannot contain white spaces or the special . and .. pathcomponents. Also, neither /lib, /lib/live (or any of their sub-directories) nor / canbe made persistent using custom mounts. As a workaround for this limitation you canadd / union to your persistence.conf file to achieve full persistence.

10.3.2 Using more than one persistence store 584

There are different methods of using multiple persistence store for different use cases. 585

For instance, using several volumes at the same time or selecting only one, amongvarious, for very specific purposes.

Several different custom overlay volumes (with their own persistence.conf files) can 586

be used at the same time, but if several volumes make the same directory persistent,only one of them will be used. If any two mounts are “nested” (i.e. one is a sub-directory of the other) the parent will be mounted before the child so no mount will behidden by the other. Nested custom mounts are problematic if they are listed in thesame persistence.conf file. See the persistence.conf(5) man page for how to handlethat case if you really need it (hint: you usually don’t).

One possible use case: If you wish to store the user data i.e. /home and the superuser 587

data i.e. /root in different partitions, create two partitions with the persistence labeland add a persistence.conf file in each one like this, # echo “/home” > persistence.conf

for the first partition that will save the user’s files and # echo “/root” > persistence.conf

for the second partition which will store the superuser’s files. Finally, use the persistenceboot parameter.

If a user would need multiple persistence store of the same type for different locations 588

54

SiSU: - Manualul Live Systemscomplete.sisudoc.org/manual/pdf/live-manual.portrait.ro.a4.pdf· ManualulLiveSystems ProiectulLiveSystems Copyright©2006-2014LiveSystemsProject - [PDF Document] (63)

Manualul Live Systems

or testing, such as private and work, the boot parameter persistence-label usedin conjunction with the boot parameter persistence will allow for multiple but uniquepersistence media. An example would be if a user wanted to use a persistence partitionlabeled private for personal data like browser bookmarks or other types, they woulduse the boot parameters: persistence persistence-label=private. And to store workrelated data, like documents, research projects or other types, they would use the bootparameters: persistence persistence-label=work.

It is important to remember that each of these volumes, private and work, also needs 589

a persistence.conf file in its root. The live-boot man page contains more informationabout how to use these labels with legacy names.

10.4 Using persistence with encryption 590

Using the persistence feature means that some sensible data might get exposed to 591

risk. Especially if the persistent data is stored on a portable device such as a usb stickor an external hard drive. That is when encryption comes in handy. Even if the entireprocedure might seem complicated because of the number of steps to be taken, it isreally easy to handle encrypted partitions with live-boot. In order to use luks , which isthe supported encryption type, you need to install cryptsetup both on the machine youare creating the encrypted partition with and also in the live system you are going touse the encrypted persistent partition with.

To install cryptsetup on your machine: 592

593

# apt-get install cryptsetup

To install cryptsetup in your live system, add it to your package-lists: 594

595

$ lb config$ echo "cryptsetup" > config/package-lists/encryption.list.chroot

Once you have your live systemwith cryptsetup, you basically only need to create a new 596

partition, encrypt it and boot with the persistence and persistence-encryption=luks

parameters. We could have already anticipated this step and added the boot parametersfollowing the usual procedure:

597

$ lb config --bootappend-live "boot=live components persistence persistence-encryption=luks"

Let’s go into the details for all of those who are not familiar with encryption. In the 598

following example we are going to use a partition on a usb stick which corresponds to

55

SiSU: - Manualul Live Systemscomplete.sisudoc.org/manual/pdf/live-manual.portrait.ro.a4.pdf· ManualulLiveSystems ProiectulLiveSystems Copyright©2006-2014LiveSystemsProject - [PDF Document] (64)

Manualul Live Systems

/dev/sdc2. Please be warned that you need to determine which partition is the one youare going to use in your specific case.

The first step is plugging in your usb stick and determine which device it is. The 599

recommended method of listing devices in live-manual is using ls -l /dev/disk/-

by-id. After that, create a new partition and then, encrypt it with a passphrase asfollows:

600

# cryptsetup --verify-passphrase luksFormat /dev/sdc2

Then open the luks partition in the virtual device mapper. Use any name you like. We 601

use live here as an example:

602

# cryptsetup luksOpen /dev/sdc2 live

The next step is filling the device with zeros before creating the filesystem: 603

604

# dd if=/dev/zero of=/dev/mapper/live

Now, we are ready to create the filesystem. Notice that we are adding the label 605

persistence so that the device is mounted as persistence store at boot time.

606

# mkfs.ext4 -L persistence /dev/mapper/live

To continue with our setup, we need to mount the device, for example in /mnt. 607

608

# mount /dev/mapper/live /mnt

And create the persistence.conf file in the root of the partition. This is, as explained 609

before, strictly necessary. See ‹The persistence.conf file›.

610

# echo "/ union" > /mnt/persistence.conf

Then unmount the mount point: 611

612

56

SiSU: - Manualul Live Systemscomplete.sisudoc.org/manual/pdf/live-manual.portrait.ro.a4.pdf· ManualulLiveSystems ProiectulLiveSystems Copyright©2006-2014LiveSystemsProject - [PDF Document] (65)

Manualul Live Systems

# umount /mnt

And optionally, although it might be a good way of securing the data we have just added 613

to the partition, we can close the device:

614

# cryptsetup luksClose live

Let’s summarize the process. So far, we have created an encryption capable live 615

system, which can be copied to a usb stick as explained in ‹Copying an ISO hybridimage to a USB stick›. We have also created an encrypted partition, which can belocated in the same usb stick to carry it around and we have configured the encryptedpartition to be used as persistence store. So now, we only need to boot the live system.At boot time, live-boot will prompt us for the passphrase and will mount the encryptedpartition to be used for persistence.

57

SiSU: - Manualul Live Systemscomplete.sisudoc.org/manual/pdf/live-manual.portrait.ro.a4.pdf· ManualulLiveSystems ProiectulLiveSystems Copyright©2006-2014LiveSystemsProject - [PDF Document] (66)

Manualul Live Systems

Customizing the binary image 616

11. Customizing the binary image 617

11.1 Bootloaders 618

live-build uses syslinux and some of its derivatives (depending on the image type) as 619

bootloaders by default. They can be easily customized to suit your needs.

In order to use a full theme, copy /usr/share/live/build/bootloaders into config/bootloaders620

and edit the files in there. If you do not want to bother modifying all supported bootloaderconfigurations, only providing a local customized copy of one of the bootloaders, e.g.isolinux in config/bootloaders/isolinux is enough too, depending on your usecase.

Whenmodifying one of the default themes, if youwant to use a personalized background 621

image that will be displayed together with the boot menu, add a splash.png picture of640x480 pixels. Then, remove the splash.svg file.

There are many possibilities when it comes to making changes. For instance, syslinux 622

derivatives are configured by default with a timeout of 0 (zero) which means that theywill pause indefinitely at their splash screen until you press a key.

Tomodify the boot timeout of a default iso-hybrid image just edit a default isolinux.cfg 623

file specifying the timeout in units of 1/10 seconds. A modified isolinux.cfg to bootafter five seconds would be similar to this:

624

include menu.cfgdefault vesamenu.c32prompt 0timeout 50

11.2 ISO metadata 625

When creating an ISO9660 binary image, you can use the following options to add 626

various textual metadata for your image. This can help you easily identify the versionor configuration of an image without booting it.

• LB_ISO_APPLICATION/--iso-application NAME: This should describe the application 627

that will be on the image. The maximum length for this field is 128 characters.

• LB_ISO_PREPARER/--iso-preparer NAME: This should describe the preparer of the 628

image, usually with some contact details. The default for this option is the live-buildversion you are using, which may help with debugging later. The maximum lengthfor this field is 128 characters.

58

SiSU: - Manualul Live Systemscomplete.sisudoc.org/manual/pdf/live-manual.portrait.ro.a4.pdf· ManualulLiveSystems ProiectulLiveSystems Copyright©2006-2014LiveSystemsProject - [PDF Document] (67)

Manualul Live Systems

• LB_ISO_PUBLISHER/--iso-publisher NAME: This should describe the publisher of 629

the image, usually with some contact details. The maximum length for this fieldis 128 characters.

• LB_ISO_VOLUME/--iso-volume NAME: This should specify the volume ID of the image. 630

This is used as a user-visible label on some platforms such as Windows and AppleMac OS. The maximum length for this field is 32 characters.

59

SiSU: - Manualul Live Systemscomplete.sisudoc.org/manual/pdf/live-manual.portrait.ro.a4.pdf· ManualulLiveSystems ProiectulLiveSystems Copyright©2006-2014LiveSystemsProject - [PDF Document] (68)

Manualul Live Systems

Customizing Debian Installer 631

12. Customizing Debian Installer 632

Live system images can be integrated with Debian Installer. There are a number of 633

different types of installation, varying in what is included and how the installer operates.

Please note the careful use of capital letters when referring to the “Debian Installer” in 634

this section - when used like this we refer explicitly to the official installer for the Debiansystem, not anything else. It is often seen abbreviated to “d-i”.

12.1 Types of Debian Installer 635

The three main types of installer are: 636

“Normal” Debian Installer : This is a normal live system image with a separate 637

kernel and initrd which (when selected from the appropriate bootloader) launches into astandard Debian Installer instance, just as if you had downloaded a CD image of Debianand booted it. Images containing a live system and such an otherwise independentinstaller are often referred to as “combined images”.

On such images, Debian is installed by fetching and installing .deb packages using 638

debootstrap, from local media or some network-based network, resulting in a defaultDebian system being installed to the hard disk.

This whole process can be preseeded and customized in a number of ways; see the 639

relevant pages in the Debian Installer manual for more information. Once you have aworking preseeding file, live-build can automatically put it in the image and enable it foryou.

“Live” Debian Installer : This is a live system image with a separate kernel and initrd 640

which (when selected from the appropriate bootloader) launches into an instance of theDebian Installer.

Installation will proceed in an identical fashion to the “normal” installation described 641

above, but at the actual package installation stage, instead of using debootstrap tofetch and install packages, the live filesystem image is copied to the target. This isachieved with a special udeb called live-installer.

After this stage, the Debian Installer continues as normal, installing and configuring 642

items such as bootloaders and local users, etc.

Note: to support both normal and live installer entries in the bootloader of the same live 643

medium, youmust disable live-installer by preseeding live-installer/enable=false.

“Desktop” Debian Installer : Regardless of the type of Debian Installer included, d-i 644

can be launched from the Desktop by clicking on an icon. This is user friendlier in somesituations. In order to make use of this, the debian-installer-launcher package needsto be included.

60

SiSU: - Manualul Live Systemscomplete.sisudoc.org/manual/pdf/live-manual.portrait.ro.a4.pdf· ManualulLiveSystems ProiectulLiveSystems Copyright©2006-2014LiveSystemsProject - [PDF Document] (69)

Manualul Live Systems

Note that by default, live-build does not include Debian Installer images in the images, 645

it needs to be specifically enabled with lb config. Also, please note that for the“Desktop” installer to work, the kernel of the live system must match the kernel d-iuses for the specified architecture. For example:

646

$ lb config --architectures i386 --linux-flavours 486 \--debian-installer live

$ echo debian-installer-launcher >> config/package-lists/my.list.chroot

12.2 Customizing Debian Installer by preseeding 647

As described in the Debian Installer Manual, Appendix B at ‹http://www.debian.org/releases/stable/ 648

i386/apb.html›, “Preseeding provides a way to set answers to questions asked during theinstallation process, without having to manually enter the answers while the installationis running. This makes it possible to fully automate most types of installation and evenoffers some features not available during normal installations.” This kind of customizationis best accomplished with live-build by placing the configuration in a preseed.cfg fileincluded in config/includes.installer/. For example, to preseed setting the localeto en_US:

649

$ echo "d-i debian-installer/locale string en_US" \>> config/includes.installer/preseed.cfg

12.3 Customizing Debian Installer content 650

For experimental or debugging purposes, you might want to include locally built d-i 651

component udeb packages. Place these in config/packages.binary/ to include themin the image. Additional or replacement files and directories may be included in theinstaller initrd as well, in a similar fashion to ‹Live/chroot local includes›, by placing thematerial in config/includes.installer/.

61

SiSU: - Manualul Live Systemscomplete.sisudoc.org/manual/pdf/live-manual.portrait.ro.a4.pdf· ManualulLiveSystems ProiectulLiveSystems Copyright©2006-2014LiveSystemsProject - [PDF Document] (70)

Manualul Live Systems

Proiect 652

62

SiSU: - Manualul Live Systemscomplete.sisudoc.org/manual/pdf/live-manual.portrait.ro.a4.pdf· ManualulLiveSystems ProiectulLiveSystems Copyright©2006-2014LiveSystemsProject - [PDF Document] (71)

Manualul Live Systems

Contributing to the project 653

13. Contributing to the project 654

When submitting a contribution, please clearly identify its copyright holder and include 655

any applicable licensing statement. Note that to be accepted, the contribution must belicensed under the same license as the rest of the documents, namely, GPL version 3or later.

Contributions to the project, such as translations and patches, are greatly welcome. 656

Anyone can directly commit to the repositories, however, we ask you to send biggerchanges to the mailing list to discuss them first. See the section ‹Contact› for moreinformation.

The Live SystemsProject usesGit as version control system and source codemanagement.657

As explained in ‹Git repositories› there are two main development branches: debianand debian-next . Everybody can commit to the debian-next branches of the live-boot,live-build, live-config, live-images, live-manual and live-tools repositories.

However, there are certain restrictions. The server will reject: 658

• Non fast-forward pushes. 659

• Merge commits. 660

• Adding or removing tags or branches. 661

Even though all commits might be revised, we ask you to use your common sense and 662

make good commits with good commit messages.

• Write commit messages that consist of complete, meaningful sentences in English, 663

starting with a capital letter and ending with a full stop. Usually, these will start withthe form “Fixing/Adding/Removing/Correcting/Translating/...”.

• Write good commit messages. The first line must be an accurate summary of the 664

contents of the commit which will be included in the changelog. If you need to makesome further explanations, write them below leaving a blank line after the first oneand then another blank line after each paragraph. Lines of paragraphs should notexceed 80 characters in length.

• Commit atomically, this is to say, do not mix unrelated things in the same commit. 665

Make one different commit for each change you make.

13.1 Making changes 666

In order to push to the repositories, you must follow the following procedure. Here we 667

use live-manual as an example so replace it with the name of the repository you wantto work with. For detailed information on how to edit live-manual see ‹Contributing tothis document›.

63

SiSU: - Manualul Live Systemscomplete.sisudoc.org/manual/pdf/live-manual.portrait.ro.a4.pdf· ManualulLiveSystems ProiectulLiveSystems Copyright©2006-2014LiveSystemsProject - [PDF Document] (72)

Manualul Live Systems

• Fetch the public commit key: 668

669

$ mkdir -p ~/.ssh/keys$ wget http://live-systems.org/other/keys/[emailprotected] -O ~/.ssh/keys/[emailprotected]$ wget http://live-systems.org/other/keys/[emailprotected] -O ~/.ssh/keys/[emailprotected]$ chmod 0600 ~/.ssh/keys/[emailprotected]*

• Adaugati urmatoarea sectiuna la openssh-client config: 670

671

$ cat >> ~/.ssh/config << EOFHost live-systems.org

Hostname live-systems.orgUser gitIdentitiesOnly yesIdentityFile ~/.ssh/keys/[emailprotected]

EOF

• Check out a clone of live-manual through ssh: 672

673

$ git clone [emailprotected]:/live-manual.git$ cd live-manual && git checkout debian-next

• Make sure you have Git author and email set: 674

675

$ git config user.name "John Doe"$ git config user.email [emailprotected]

Important: Remember that you should commit any changes on the debian-next 676

branch.

• Make your changes. In this example you would first write a new section dealing 677

with applying patches and then prepare to commit adding the files and writing yourcommit message like this:

678

$ git commit -a -m "Adding a section on applying patches."

• Primite commit-ul la server: 679

680

$ git push

64

SiSU: - Manualul Live Systemscomplete.sisudoc.org/manual/pdf/live-manual.portrait.ro.a4.pdf· ManualulLiveSystems ProiectulLiveSystems Copyright©2006-2014LiveSystemsProject - [PDF Document] (73)

Manualul Live Systems

Reporting bugs 681

14. Reporting bugs 682

Live systems are far from being perfect, but we want to make it as close as possible to 683

perfect - with your help. Do not hesitate to report a bug. It is better to fill a report twicethan never. However, this chapter includes recommendations on how to file good bugreports.

For the impatient: 684

• Always check first the image status updates on our homepage at ‹http://live-systems.org/› 685

for known issues.

• Before submitting a bug report always try to reproduce the bug with themost recent 686

versions of the branch of live-build, live-boot, live-config and live-tools that you’reusing (like the newest 4.x version of live-build if you’re using live-build 4).

• Try to give as specific information as possible about the bug. This includes 687

(at least) the version of live-build, live-boot, live-config, and live-tools used and thedistribution of the live system you are building.

14.1 Known issues 688

Since Debian testing and Debian unstable distributions are moving targets, when 689

you specify either of them as the target system distribution, a successful build may notalways be possible.

If this causes too much difficulty for you, do not build a system based on testing or 690

unstable , but rather, use stable . live-build always defaults to the stable release.

Currently known issues are listed under the section ‘status’ on our homepage at ‹http: 691

//live-systems.org/›.

It is out of the scope of this manual to train you to correctly identify and fix problems 692

in packages of the development distributions, however, there are two things you canalways try: If a build fails when the target distribution is testing , try unstable . Ifunstable does not work either, revert to testing and pin the newer version of thefailing package from unstable (see ‹APT pinning› for details).

14.2 Rebuild from scratch 693

To ensure that a particular bug is not caused by an uncleanly built system, please always 694

rebuild the whole live system from scratch to see if the bug is reproducible.

65

SiSU: - Manualul Live Systemscomplete.sisudoc.org/manual/pdf/live-manual.portrait.ro.a4.pdf· ManualulLiveSystems ProiectulLiveSystems Copyright©2006-2014LiveSystemsProject - [PDF Document] (74)

Manualul Live Systems

14.3 Use up-to-date packages 695

Using outdated packages can cause significant problems when trying to reproduce 696

(and ultimately fix) your problem. Make sure your build system is up-to-date and anypackages included in your image are up-to-date as well.

14.4 Collect information 697

Please provide enough information with your report. Include, at least, the exact version 698

of live-build where the bug is encountered and the steps to reproduce it. Please useyour common sense and provide any other relevant information if you think that it mighthelp in solving the problem.

Tomake themost out of your bug report, we require at least the following information: 699

• Architecture of the host system 700

• Distribution of the host system 701

• Version of live-build on the host system 702

• Version of Python on the host system 703

• Version of debootstrap and/or cdebootstrap on the host system 704

• Architecture of the live system 705

• Distribution of the live system 706

• Version of live-boot on the live system 707

• Version of live-config on the live system 708

• Version of live-tools on the live system 709

You can generate a log of the build process by using the tee command. We recommend 710

doing this automatically with an auto/build script (see ‹Managing a configuration› fordetails).

711

# lb build 2>&1 | tee build.log

At boot time, live-boot and live-config store their logfiles in /var/log/live/. Check 712

them for error messages.

Additionally, to rule out other errors, it is always a good idea to tar up your config/ 713

directory and upload it somewhere (do not send it as an attachment to the mailing list),so that we can try to reproduce the errors you encountered. If this is difficult (e.g. due tosize) you can use the output of lb config --dump which produces a summary of yourconfig tree (i.e. lists files in subdirectories of config/ but does not include them).

Remember to send in any logs that were produced with English locale settings, e.g. 714

run your live-build commands with a leading LC_ALL=C or LC_ALL=en_US.

66

SiSU: - Manualul Live Systemscomplete.sisudoc.org/manual/pdf/live-manual.portrait.ro.a4.pdf· ManualulLiveSystems ProiectulLiveSystems Copyright©2006-2014LiveSystemsProject - [PDF Document] (75)

Manualul Live Systems

14.5 Isolate the failing case if possible 715

If possible, isolate the failing case to the smallest possible change that breaks. It is 716

not always easy to do this so if you cannot manage it for your report, do not worry.However, if you plan your development cycle well, using small enough change setsper iteration, you may be able to isolate the problem by constructing a simpler ‘base’configuration that closely matches your actual configuration plus just the broken changeset added to it. If you have a hard time sorting out which of your changes broke, it maybe that you are including too much in each change set and should develop in smallerincrements.

14.6 Use the correct package to report the bug against 717

If you do not know what component is responsible for the bug or if the bug is a 718

general bug concerning live systems, you can fill a bug against the debian-live pseudo-package.

However, we would appreciate it if you try to narrow it down according to where the bug 719

appears.

14.6.1 At build time while bootstrapping 720

live-build first bootstraps a basic Debian system with debootstrap or cdebootstrap. 721

Depending on the bootstrapping tool used and theDebian distribution it is bootstrapping,it may fail. If a bug appears here, check if the error is related to a specific Debianpackage (most likely), or if it is related to the bootstrapping tool itself.

In both cases, this is not a bug in the live system, but rather in Debian itself and probably 722

we cannot fix it directly. Please report such a bug against the bootstrapping tool or thefailing package.

14.6.2 At build time while installing packages 723

live-build installs additional packages from the Debian archive and depending on the 724

Debian distribution used and the daily archive state, it can fail. If a bug appears here,check if the error is also reproducible on a normal system.

If this is the case, this is not a bug in the live system, but rather in Debian - please 725

report it against the failing package. Running debootstrap separately from the Livesystem build or running lb bootstrap --debug will give you more information.

Also, if you are using a local mirror and/or any sort of proxy and you are experiencing a 726

problem, please always reproduce it first by bootstrapping from an official mirror.

67

SiSU: - Manualul Live Systemscomplete.sisudoc.org/manual/pdf/live-manual.portrait.ro.a4.pdf· ManualulLiveSystems ProiectulLiveSystems Copyright©2006-2014LiveSystemsProject - [PDF Document] (76)

Manualul Live Systems

14.6.3 At boot time 727

If your image does not boot, please report it to themailing list together with the information 728

requested in ‹Collect information›. Do not forget to mention, how/when the image failedexactly, whether using virtualization or real hardware. If you are using a virtualizationtechnology of any kind, please always run it on real hardware before reporting a bug.Providing a screenshot of the failure is also very helpful.

14.6.4 At run time 729

If a package was successfully installed, but fails while actually running the Live system, 730

this is probably a bug in the live system. However:

14.7 Do the research 731

Before filing the bug, please search the web for the particular error message or symptom 732

you are getting. As it is highly unlikely that you are the only person experiencing aparticular problem. There is always a chance that it has been discussed elsewhereand a possible solution, patch, or workaround has been proposed.

You should pay particular attention to the live systems mailing list, as well as the 733

homepage, as these are likely to contain the most up-to-date information. If suchinformation exists, always include the references to it in your bug report.

In addition, you should check the current bug lists for live-build, live-boot, live-config 734

and live-tools to see whether something similar has already been reported.

14.8 Where to report bugs 735

The Live Systems Project keeps track of all bugs in the Bug Tracking System (BTS). 736

For information on how to use the system, please see ‹http://bugs.debian.org/›. You can alsosubmit the bugs by using the reportbug command from the package with the samename.

In general, you should report build time errors against the live-build package, boot time 737

errors against live-boot, and run time errors against live-config. If you are unsure ofwhich package is appropriate or need more help before submitting a bug report, pleasereport it against the debian-live pseudo-package. We will then take care about it andreassign it where appropriate.

Please note that bugs found in distributions derived from Debian (such as Ubuntu and 738

others) should not be reported to the Debian BTS unless they can be also reproducedon a Debian system using official Debian packages.

68

SiSU: - Manualul Live Systemscomplete.sisudoc.org/manual/pdf/live-manual.portrait.ro.a4.pdf· ManualulLiveSystems ProiectulLiveSystems Copyright©2006-2014LiveSystemsProject - [PDF Document] (77)

Manualul Live Systems

Coding Style 739

15. Coding Style 740

This chapter documents the coding style used in live systems. 741

15.1 Compatibility 742

• Don’t use syntax or semantics that are unique to the Bash shell. For example, the 743

use of array constructs.

• Only use the POSIX subset - for example, use $(foo) over ‘foo‘. 744

• You can check your scripts with ‘sh -n’ and ‘checkbashisms’. 745

• Make sure all shell code runs with ‘set -e’. 746

15.2 Indenting 747

• Always use tabs over spaces. 748

15.3 Wrapping 749

• Generally, lines are 80 chars at maximum. 750

• Use the “Linux style” of line breaks: 751

Bad: 752

753

if foo; thenbar

fi

Good: 754

755

if foothen

barfi

• The same holds for functions: 756

Bad: 757

758

69

SiSU: - Manualul Live Systemscomplete.sisudoc.org/manual/pdf/live-manual.portrait.ro.a4.pdf· ManualulLiveSystems ProiectulLiveSystems Copyright©2006-2014LiveSystemsProject - [PDF Document] (78)

Manualul Live Systems

Foo () {bar

}

Good: 759

760

Foo (){

bar}

15.4 Variables 761

• Variables are always in capital letters. 762

• Variables used in live-build always start with LB_ prefix. 763

• Internal temporary variables in live-build should start with the <=underscore>LB_ 764

prefix.

• Local variables start with live-build <=underscore><=underscore>LB_ prefix. 765

• Variables in connection to a boot parameter in live-config start with LIVE_. 766

• All other variables in live-config start with _ prefix. 767

• Use braces around variables; e.g. write ${FOO} instead of $FOO. 768

• Always protect variables with quotes to respect potential whitespaces: write “${FOO}” 769

not ${FOO}.

• For consistency reasons, always use quotes when assigning values to variables: 770

Bad: 771

772

FOO=bar

Good: 773

774

FOO="bar"

• If multiple variables are used, quote the full expression: 775

Bad: 776

777

70

SiSU: - Manualul Live Systemscomplete.sisudoc.org/manual/pdf/live-manual.portrait.ro.a4.pdf· ManualulLiveSystems ProiectulLiveSystems Copyright©2006-2014LiveSystemsProject - [PDF Document] (79)

Manualul Live Systems

if [ -f "${FOO}"/foo/"${BAR}"/bar ]then

foobarfi

Good: 778

779

if [ -f "${FOO}/foo/${BAR}/bar" ]then

foobarfi

15.5 Miscellaneous 780

• Use “|” (without the surround quotes) as a separator in calls to sed, e.g. “sed -e 781

`s|'” (without “”).

• Don’t use the test command for comparisons or tests, use “[” “]” (without “”); e.g. 782

”if [ -x /bin/foo ]; ...“ and not ”if test -x /bin/foo; ...”.

• Use case wherever possible over test, as it’s easier to read and faster in execution. 783

• Use capitalized names for functions to limit messing with the users environment. 784

71

SiSU: - Manualul Live Systemscomplete.sisudoc.org/manual/pdf/live-manual.portrait.ro.a4.pdf· ManualulLiveSystems ProiectulLiveSystems Copyright©2006-2014LiveSystemsProject - [PDF Document] (80)

Manualul Live Systems

Procedures 785

16. Procedures 786

This chapter documents the procedures within the Live Systems Project for various 787

tasks that need cooperation with other teams in Debian.

16.1 Major Releases 788

Releasing a new stable major version of Debian includes a lot of different teams working 789

together to make it happen. At some point, the Live team comes in and builds livesystem images. The requirements to do this are:

• Amirror containing the released versions for the debian and debian-security archives 790

which the debian-live buildd can access.

• The names of the image need to be known (e.g. debian-live-VERSION-ARCH- 791

FLAVOUR.iso).

• The data from debian-cd needs to be synced (udeb exclude lists). 792

• Images are built and mirrored on cdimage.debian.org. 793

16.2 Point Releases 794

• Again, we need updated mirrors of debian and debian-security. 795

• Images are built and mirrored on cdimage.debian.org. 796

• Send announcement mail. 797

16.2.1 Last Point Release of a Debian Release 798

Remember to adjust both chroot and binary mirrors when building the last set of images 799

for a Debian release after it has beenmoved away from ftp.debian.org to archive.debian.org.That way, old prebuilt live images are still useful without user modifications.

16.2.2 Point release announcement template 800

An announcement mail for point releases can be generated using the template below 801

and the following command:

802

$ sed \-e 's|@MAJOR@|7.0|g' \-e 's|@MINOR@|7.0.1|g' \-e 's|@CODENAME@|wheezy|g' \-e 's|@ANNOUNCE@|2013/msgXXXXX.html|g'

72

SiSU: - Manualul Live Systemscomplete.sisudoc.org/manual/pdf/live-manual.portrait.ro.a4.pdf· ManualulLiveSystems ProiectulLiveSystems Copyright©2006-2014LiveSystemsProject - [PDF Document] (81)

Manualul Live Systems

Please check themail carefully before sending and pass it to others for proof-reading. 803

804

Updated Live @MAJOR@: @MINOR@ released

The Live Systems Project is pleased to announce the @MINOR@ update of theLive images for the stable distribution Debian @MAJOR@ (codename "@CODENAME@").

The images are available for download at:

<http://live-systems.org/cdimage/release/current/>

and later at:

<http://cdimage.debian.org/cdimage/release/current-live/>

This update includes the changes of the Debian @MINOR@ release:

<http://lists.debian.org/debian-announce/@ANNOUNCE@>

Additionally it includes the following Live-specific changes:

* [INSERT LIVE-SPECIFIC CHANGE HERE]* [INSERT LIVE-SPECIFIC CHANGE HERE]* [LARGER ISSUES MAY DESERVE THEIR OWN SECTION]

About Live Systems------------------The Live Systems Project produces the tools used to build officiallive systems and the official live images themselves for Debian.

About Debian------------The Debian Project is an association of Free Software developers whovolunteer their time and effort in order to produce the completely freeoperating system Debian.

Contact Information-------------------For further information, please visit the Live Systems web pages at<http://live-systems.org/>, or contact the Live Systems team at<[emailprotected]>.

73

SiSU: - Manualul Live Systemscomplete.sisudoc.org/manual/pdf/live-manual.portrait.ro.a4.pdf· ManualulLiveSystems ProiectulLiveSystems Copyright©2006-2014LiveSystemsProject - [PDF Document] (82)

Manualul Live Systems

Git repositories 805

17. Git repositories 806

The list of all the available repositories of the Live Systems Project can be found at ‹http:// 807

live-systems.org/gitweb/›. The project’s git URLs have the form: protocol://live-systems.-org/git/repository. Thus, in order to clone live-manual read-only, launch:

808

$ git clone git://live-systems.org/git/live-manual.git

Or, 809

810

$ git clone https://live-systems.org/git/live-manual.git

Or, 811

812

$ git clone http://live-systems.org/git/live-manual.git

The cloning addresseswith write permission have the form: [emailprotected]:/repository.813

So, again, to clone live-manual over ssh you must type: 814

815

$ git clone [emailprotected]:live-manual.git

The git tree is made up of several different branches. The debian and the debian- 816

next branches are particularly noteworthy because they contain the actual work thatwill eventually be included in each new release.

After cloning any of the existing repositories, you will be on the debian branch. This is 817

appropriate to take a look at the state of the project’s latest release but before startingwork it is crucial to switch to the debian-next branch. To do so:

818

$ git checkout debian-next

The debian-next branch, which is not always fast-forward, is where all the changes are 819

committed first before being merged into the debian branch. To make an analogy, it islike a testing ground. If you are working on this branch and need to pull, you will have todo a git pull --rebase so that your local modifications are staged while pulling fromthe server and then your changes will be put on top of it all.

74

SiSU: - Manualul Live Systemscomplete.sisudoc.org/manual/pdf/live-manual.portrait.ro.a4.pdf· ManualulLiveSystems ProiectulLiveSystems Copyright©2006-2014LiveSystemsProject - [PDF Document] (83)

Manualul Live Systems

17.1 Handling multiple repositories 820

If you intend to clone several of the live systems repositories and want to switch to the 821

debian-next branch right away to check the latest code, write a patch or contribute witha translation you ought to know that the git server provides a mrconfig file to ease thehandling of multiple repositories. In order to use it you need to install the mr packageand after that, launch:

822

$ mr bootstrap http://live-systems.org/other/mr/mrconfig

This command will automatically clone and checkout to the debian-next branch the 823

development repositories of the Debian packages produced by the project. Theseinclude, among others, the live-images repository, which contains the configurationsused for the prebuilt images that the project publishes for general use. For moreinformation on how to use this repository, see ‹Clone a configuration published viaGit›

75

SiSU: - Manualul Live Systemscomplete.sisudoc.org/manual/pdf/live-manual.portrait.ro.a4.pdf· ManualulLiveSystems ProiectulLiveSystems Copyright©2006-2014LiveSystemsProject - [PDF Document] (84)

Manualul Live Systems

Exemple 824

76

SiSU: - Manualul Live Systemscomplete.sisudoc.org/manual/pdf/live-manual.portrait.ro.a4.pdf· ManualulLiveSystems ProiectulLiveSystems Copyright©2006-2014LiveSystemsProject - [PDF Document] (85)

Manualul Live Systems

Exemple 825

18. Examples 826

This chapter covers example builds for specific use cases with live systems. If you are 827

new to building your own live system images, we recommend you first look at the threetutorials in sequence, as each one teaches new techniques that will help you use andunderstand the remaining examples.

18.1 Using the examples 828

To use these examples you need a system to build them on that meets the requirements 829

listed in ‹Requirements› and has live-build installed as described in ‹Installing live-build›.

Note that, for the sake of brevity, in these examples we do not specify a local mirror to 830

use for the build. You can speed up downloads considerably if you use a local mirror.You may specify the options when you use lb config, as described in ‹Distributionmirrors used at build time›, or for more convenience, set the default for your buildsystem in /etc/live/build.conf. Simply create this file and in it, set the correspondingLB_MIRROR_* variables to your preferred mirror. All other mirrors used in the build willbe defaulted from these values. For example:

831

LB_MIRROR_BOOTSTRAP="http://mirror/debian/"LB_MIRROR_CHROOT_SECURITY="http://mirror/debian-security/"LB_MIRROR_CHROOT_BACKPORTS="http://mirror/debian-backports/"

18.2 Tutorial 1: A default image 832

Use case: Create a simple first image, learning the basics of live-build. 833

In this tutorial, we will build a default ISO hybrid live system image containing only base 834

packages (no Xorg) and some live system support packages, as a first exercise in usinglive-build.

You can’t get much simpler than this: 835

836

$ mkdir tutorial1 ; cd tutorial1 ; lb config

Examine the contents of the config/ directory if you wish. You will see stored here a 837

skeletal configuration, ready to customize or, in this case, use immediately to build adefault image.

77

SiSU: - Manualul Live Systemscomplete.sisudoc.org/manual/pdf/live-manual.portrait.ro.a4.pdf· ManualulLiveSystems ProiectulLiveSystems Copyright©2006-2014LiveSystemsProject - [PDF Document] (86)

Manualul Live Systems

Now, as superuser, build the image, saving a log as you build with tee. 838

839

# lb build 2>&1 | tee build.log

Assuming all goes well, after a while, the current directory will contain live-image- 840

i386.hybrid.iso. This ISO hybrid image can be booted directly in a virtual machineas described in ‹Testing an ISO image with Qemu› and ‹Testing an ISO image withVirtualBox›, or else imaged onto optical media or a USB flash device as described in‹Burning an ISO image to a physical medium› and ‹Copying an ISO hybrid image to aUSB stick›, respectively.

18.3 Tutorial 2: A web browser utility 841

Use case: Create aweb browser utility image, learning how to apply customizations. 842

In this tutorial, we will create an image suitable for use as a web browser utility, serving 843

as an introduction to customizing live system images.

844

$ mkdir tutorial2$ cd tutorial2$ lb config$ echo "task-lxde-desktop iceweasel" >> config/package-lists/my.list.chroot$ lb config

Our choice of LXDE for this example reflects our desire to provide a minimal desktop 845

environment, since the focus of the image is the single use we have in mind, the webbrowser. We could go even further and provide a default configuration for the webbrowser in config/includes.chroot/etc/iceweasel/profile/, or additional supportpackages for viewing various kinds of web content, but we leave this as an exercise forthe reader.

Build the image, again as superuser, keeping a log as in ‹Tutorial 1›: 846

847

# lb build 2>&1 | tee build.log

Again, verify the image is OK and test, as in ‹Tutorial 1›. 848

18.4 Tutorial 3: A personalized image 849

Use case: Create a project to build a personalized image, containing your favourite 850

software to take with you on a USB stick wherever you go, and evolving in successiverevisions as your needs and preferences change.

78

SiSU: - Manualul Live Systemscomplete.sisudoc.org/manual/pdf/live-manual.portrait.ro.a4.pdf· ManualulLiveSystems ProiectulLiveSystems Copyright©2006-2014LiveSystemsProject - [PDF Document] (87)

Manualul Live Systems

Since we will be changing our personalized image over a number of revisions, and we 851

want to track those changes, trying things experimentally and possibly reverting them ifthings don’t work out, we will keep our configuration in the popular git version controlsystem. We will also use the best practice of autoconfiguration via auto scripts asdescribed in ‹Managing a configuration›.

18.4.1 First revision 852

853

$ mkdir -p tutorial3/auto$ cp /usr/share/doc/live-build/examples/auto/* tutorial3/auto/$ cd tutorial3

Edit auto/config to read as follows: 854

855

#!/bin/sh

lb config noauto \--architectures i386 \--linux-flavours 686-pae \"${@}"

Perform lb config to generate the config tree, using the auto/config script you just 856

created:

857

$ lb config

Now populate your local package list: 858

859

$ echo "task-lxde-desktop iceweasel xchat" >> config/package-lists/my.list.chroot

First, --architectures i386 ensures that on our amd64 build system, we build a 32-bit 860

version suitable for use on most machines. Second, we use --linux-flavours 686-

pae because we don’t anticipate using this image on much older systems. Third, wehave chosen the lxde task metapackage to give us a minimal desktop. And finally, wehave added two initial favourite packages: iceweasel and xchat.

Now, build the image: 861

862

# lb build

79

SiSU: - Manualul Live Systemscomplete.sisudoc.org/manual/pdf/live-manual.portrait.ro.a4.pdf· ManualulLiveSystems ProiectulLiveSystems Copyright©2006-2014LiveSystemsProject - [PDF Document] (88)

Manualul Live Systems

Note that unlike in the first two tutorials, we no longer have to type 2>&1 |tee build.log 863

as that is now included in auto/build.

Once you’ve tested the image (as in ‹Tutorial 1›) and are satisfied it works, it’s time to 864

initialize our git repository, adding only the auto scripts we just created, and then makethe first commit:

865

$ git init$ cp /usr/share/doc/live-build/examples/gitignore .gitignore$ git add .$ git commit -m "Initial import."

18.4.2 Second revision 866

In this revision, we’re going to clean up from the first build, add the vlc package to our 867

configuration, rebuild, test and commit.

The lb clean command will clean up all generated files from the previous build except 868

for the cache, which saves having to re-download packages. This ensures that thesubsequent lb buildwill re-run all stages to regenerate the files from our new configuration.

869

# lb clean

Now append the vlc package to our local package list in config/package-lists/my.- 870

list.chroot:

871

$ echo vlc >> config/package-lists/my.list.chroot

Build again: 872

873

# lb build

Test, and when you’re satisfied, commit the next revision: 874

875

$ git commit -a -m "Adding vlc media player."

Of course, more complicated changes to the configuration are possible, perhaps adding 876

files in subdirectories of config/. When you commit new revisions, just take care not

80

SiSU: - Manualul Live Systemscomplete.sisudoc.org/manual/pdf/live-manual.portrait.ro.a4.pdf· ManualulLiveSystems ProiectulLiveSystems Copyright©2006-2014LiveSystemsProject - [PDF Document] (89)

Manualul Live Systems

to hand edit or commit the top-level files in config containing LB_* variables, as theseare build products, too, and are always cleaned up by lb clean and re-created with lb

config via their respective auto scripts.

We’ve come to the end of our tutorial series. While many more kinds of customization 877

are possible, even just using the few features explored in these simple examples, analmost infinite variety of different images can be created. The remaining examples inthis section cover several other use cases drawn from the collected experiences ofusers of live systems.

18.5 A VNC Kiosk Client 878

Use case: Create an image with live-build to boot directly to a VNC server. 879

Make a build directory and create an skeletal configuration inside it, disabling recommends880to make a minimal system. And then create two initial package lists: the first onegeneratedwith a script provided by live-build named Packages (see ‹Generated packagelists›), and the second one including xorg, gdm3, metacity and xvnc4viewer.

881

$ mkdir vnc-kiosk-client$ cd vnc-kiosk-client$ lb config -a i386 -k 686-pae --apt-recommends false$ echo '! Packages Priority standard' > config/package-lists/standard.list.chroot$ echo "xorg gdm3 metacity xvnc4viewer" > config/package-lists/my.list.chroot

As explained in ‹Tweaking APT to save space› youmay need to re-add some recommended882packages to make your image work properly.

An easy way to list recommends is using apt-cache. For example: 883

884

$ apt-cache depends live-config live-boot

In this example we found out that we had to re-include several packages recommended 885

by live-config and live-boot: user-setup tomake autologin work and sudo as an essentialprogram to shutdown the system. Besides, it could be handy to add live-tools to beable to copy the image to RAM and eject to eventually eject the live medium. So:

886

$ echo "live-tools user-setup sudo eject" > config/package-lists/recommends.list.chroot

After that, create the directory /etc/skel in config/includes.chroot and put a custom 887

.xsession in it for the default user that will launch metacity and start xvncviewer,connecting to port 5901 on a server at 192.168.1.2:

888

81

SiSU: - Manualul Live Systemscomplete.sisudoc.org/manual/pdf/live-manual.portrait.ro.a4.pdf· ManualulLiveSystems ProiectulLiveSystems Copyright©2006-2014LiveSystemsProject - [PDF Document] (90)

Manualul Live Systems

$ mkdir -p config/includes.chroot/etc/skel$ cat > config/includes.chroot/etc/skel/.xsession << EOF#!/bin/sh

/usr/bin/metacity &/usr/bin/xvncviewer 192.168.1.2:1

exitEOF

Build the image: 889

890

# lb build

Enjoy. 891

18.6 A base image for a 128MB USB key 892

Use case: Create a default image with some components removed in order to fit on a 893

128MB USB key with a little space left over to use as you see fit.

When optimizing an image to fit a certain media size, you need to understand the 894

tradeoffs you are making between size and functionality. In this example, we trimonly so much as to make room for additional material within a 128MB media size, butwithout doing anything to destroy the integrity of the packages contained within, suchas the purging of locale data via the localepurge package, or other such “intrusive”optimizations. Of particular note, we use --debootstrap-options to create a minimalsystem from scratch.

895

$ lb config -k 486 --apt-indices false --apt-recommends false --debootstrap-options "--variant=minbase" --←↩firmware-chroot false --memtest none

Tomake the imagework properly, wemust re-add, at least, two recommended packages 896

which are left out by the --apt-recommends false option. See ‹Tweaking APT to savespace›

897

$ echo "user-setup sudo" > config/package-lists/recommends.list.chroot

Now, build the image in the usual way: 898

899

# lb build 2>&1 | tee build.log

82

SiSU: - Manualul Live Systemscomplete.sisudoc.org/manual/pdf/live-manual.portrait.ro.a4.pdf· ManualulLiveSystems ProiectulLiveSystems Copyright©2006-2014LiveSystemsProject - [PDF Document] (91)

Manualul Live Systems

On the author’s system at the time of writing this, the above configuration produced a 900

77MB image. This compares favourably with the 177MB image produced by the defaultconfiguration in ‹Tutorial 1›.

The biggest space-saver here, compared to building a default image on an i386 architecture901system, is to select only the 486 kernel flavour instead of the default -k “486 686-

pae”. Leaving off APT’s indices with --apt-indices false also saves a fair amountof space, the tradeoff being that you need to do an apt-get update before usingapt in the live system. Dropping recommended packages with --apt-recommends

false saves some additional space, at the expense of omitting some packages youmight otherwise expect to be there. --debootstrap-options “--variant=minbase”

bootstraps aminimal system from the start. Not automatically including firmware packageswith --firmware-chroot false saves some space too. And finally, --memtest none

prevents the installation of a memory tester.

Note: A minimal system can also be achieved using hooks, like for example the 902

stripped.hook.chroot hook found in /usr/share/doc/live-build/examples/hooks.It may shave off additional small amounts of space and produce an image of 62MB.However, it does so by removal of documentation and other files from packages installedon the system. This violates the integrity of those packages and that, as the commentheader warns, may have unforeseen consequences. That is why using a minimaldebootstrap is the recommended way of achieving this goal.

18.7 A localized GNOME desktop and installer 903

Use case: Create a GNOME desktop image, localized for Switzerland and including 904

an installer.

We want to make an iso-hybrid image for i386 architecture using our preferred desktop, 905

in this case GNOME, containing all of the same packages that would be installed bythe standard Debian installer for GNOME.

Our initial problem is the discovery of the names of the appropriate language tasks. 906

Currently, live-build cannot help with this. While we might get lucky and find thisby trial-and-error, there is a tool, grep-dctrl, which can be used to dig it out of thetask descriptions in tasksel-data, so to prepare, make sure you have both of thosethings:

907

# apt-get install dctrl-tools tasksel-data

Now we can search for the appropriate tasks, first with: 908

909

$ grep-dctrl -FTest-lang de /usr/share/tasksel/descs/debian-tasks.desc -sTaskTask: german

83

SiSU: - Manualul Live Systemscomplete.sisudoc.org/manual/pdf/live-manual.portrait.ro.a4.pdf· ManualulLiveSystems ProiectulLiveSystems Copyright©2006-2014LiveSystemsProject - [PDF Document] (92)

Manualul Live Systems

By this command, we discover the task is called, plainly enough, german. Now to find 910

the related tasks:

911

$ grep-dctrl -FEnhances german /usr/share/tasksel/descs/debian-tasks.desc -sTaskTask: german-desktopTask: german-kde-desktop

At boot time we will generate the de_CH.UTF-8 locale and select the ch keyboard 912

layout. Now let’s put the pieces together. Recalling from ‹Using metapackages› thattaskmetapackages are prefixed task-, we just specify these language boot parameters,then add standard priority packages and all our discovered task metapackages to ourpackage list as follows:

913

$ mkdir live-gnome-ch$ cd live-gnome-ch$ lb config \

-a i386 \-k 486 \--bootappend-live "boot=live components locales=de_CH.UTF-8 keyboard-layouts=ch" \--debian-installer live

$ echo '! Packages Priority standard' > config/package-lists/standard.list.chroot$ echo task-gnome-desktop task-german task-german-desktop >> config/package-lists/desktop.list.chroot$ echo debian-installer-launcher >> config/package-lists/installer.list.chroot

Note that we have included the debian-installer-launcher package to launch the installer 914

from the live desktop, and have also specified the 486 flavour kernel, as it is currentlynecessary to make the installer and live system kernels match for the launcher to workproperly.

84

SiSU: - Manualul Live Systemscomplete.sisudoc.org/manual/pdf/live-manual.portrait.ro.a4.pdf· ManualulLiveSystems ProiectulLiveSystems Copyright©2006-2014LiveSystemsProject - [PDF Document] (93)

Manualul Live Systems

Anexă 915

85

SiSU: - Manualul Live Systemscomplete.sisudoc.org/manual/pdf/live-manual.portrait.ro.a4.pdf· ManualulLiveSystems ProiectulLiveSystems Copyright©2006-2014LiveSystemsProject - [PDF Document] (94)

Manualul Live Systems

Style guide 916

19. Style guide 917

19.1 Guidelines for authors 918

This section deals with some general considerations to be taken into account when 919

writing technical documentation for live-manual. They are divided into linguistic featuresand recommended procedures.

Note: Authors should first read ‹Contributing to this document› 920

19.1.1 Linguistic features 921

• Use plain English 922

Keep in mind that a high percentage of your readers are not native speakers of English. 923

So as a general rule try to use short, meaningful sentences, followed by a full stop.

This does not mean that you have to use a simplistic, naive style. It is a suggestion to 924

try to avoid, as much as possible, complex subordinate sentences that make the textdifficult to understand for non-native speakers of English.

• Variety of English 925

The most widely spread varieties of English are British and American so it is very likely 926

that most authors will use either one or the other. In a collaborative environment, theideal variety would be “International English” but it is very difficult, not to say impossible,to decide on which variety among all the existing ones, is the best to use.

We expect that different varieties may mix without creating misunderstandings but in 927

general terms you should try to be coherent and before deciding on using British,American or any other English flavour at your discretion, please take a look at howother people write and try to imitate them.

• Be balanced 928

Do not be biased. Avoid including references to ideologies completely unrelated to live- 929

manual. Technical writing should be as neutral as possible. It is in the very nature ofscientific writing.

• Be politically correct 930

Try to avoid sexist language as much as possible. If you need to make references 931

to the third person singular preferably use “they” rather than “he” or “she” or awkwardinventions such as “s/he”, “s(he)” and the like.

• Be concise 932

86

SiSU: - Manualul Live Systemscomplete.sisudoc.org/manual/pdf/live-manual.portrait.ro.a4.pdf· ManualulLiveSystems ProiectulLiveSystems Copyright©2006-2014LiveSystemsProject - [PDF Document] (95)

Manualul Live Systems

Go straight to the point and do not wander around aimlessly. Give as much information 933

as necessary but do not give more information than necessary, this is to say, do notexplain unnecessary details. Your readers are intelligent. Presume some previousknowledge on their part.

• Minimize translation work 934

Keep in mind that whatever you write will have to be translated into several other 935

languages. This implies that a number of people will have to do an extra work if youadd useless or redundant information.

• Be coherent 936

As suggested before, it is almost impossible to standardize a collaborative document 937

into a perfectly unified whole. However, every effort on your side to write in a coherentway with the rest of the authors will be appreciated.

• Be cohesive 938

Use asmany text-forming devices as necessary tomake your text cohesive and unambiguous.939

(Text-forming devices are linguistic markers such as connectors).

• Be descriptive 940

It is preferable to describe the point in one or several paragraphs than merely using 941

a number of sentences in a typical “changelog” style. Describe it! Your readers willappreciate it.

• Dictionary 942

Look up the meaning of words in a dictionary or encyclopedia if you do not know how 943

to express certain concepts in English. But keep in mind that a dictionary can eitherbe your best friend or can turn into your worst enemy if you do not know how to use itcorrectly.

English has the largest vocabulary that exists (with over one million words). Many of 944

these words are borrowings from other languages. When looking up the meaning ofwords in a bilingual dictionary the tendency of a non-native speaker of English is tochoose the one that sounds more similar in their mother tongue. This often turns intoan excessively formal discourse which does not sound quite natural in English.

As a general rule, if a concept can be expressed using different synonyms, it is a good 945

advice to choose the first word proposed by the dictionary. If in doubt, choosing words ofGermanic origin (Usually monosyllabic words) is often the right thing to do. Be warnedthat these two techniques might produce a rather informal discourse but at least yourchoice of words will be of wide use and generally accepted.

Using a dictionary of collocations is recommended. They are extremely helpful when it 946

comes to know which words usually occur together.

Again it is a good practice to learn from the work of others. Using a search engine to 947

check how other authors use certain expressions may help a lot.

87

SiSU: - Manualul Live Systemscomplete.sisudoc.org/manual/pdf/live-manual.portrait.ro.a4.pdf· ManualulLiveSystems ProiectulLiveSystems Copyright©2006-2014LiveSystemsProject - [PDF Document] (96)

Manualul Live Systems

• False friends, idioms and other idiomatic expressions 948

Watch out for false friends. No matter how proficient you are in a foreign language you 949

cannot help falling from time to time in the trap of the so called “false friends”, wordsthat look similar in two languages but whose meanings or uses might be completelydifferent.

Try to avoid idioms as much as possible. “Idioms” are expressions that may convey a 950

completely differentmeaning fromwhat their individual words seem tomean. Sometimes,idioms might be difficult to understand even for native speakers of English!

• Avoid slang, abbreviations, contractions... 951

Even though you are encouraged to use plain, everyday English, technical writing 952

belongs to the formal register of the language.

Try to avoid slang, unusual abbreviations that are difficult to understand and above 953

all contractions that try to imitate the spoken language. Not to mention typical irc andfamily friendly expressions.

19.1.2 Procedures 954

• Test before write 955

It is important that authors test their examples before adding them to live-manual to 956

ensure that everything works as described. Testing on a clean chroot or VM canbe a good starting point. Besides, it would be ideal if the tests were then carriedout on different machines with different hardware to spot possible problems that mayarise.

• Examples 957

When providing an example try to be as specific as you can. An example is, after all, 958

just an example.

It is often better to use a line that only applies to a specific case than using abstractions 959

that may confuse your readers. In this case you can provide a brief explanation of theeffects of the proposed example.

There may be some exceptions when the example suggests using some potentially 960

dangerous commands that, if misused, may cause data loss or other similar undesirableeffects. In this case you should provide a thorough explanation of the possible sideeffects.

• External links 961

Links to external sites should only be used when the information on those sites is crucial 962

when it comes to understanding a special point. Even so, try to use links to external sitesas sparsely as possible. Internet links are likely to change from time to time resultingin broken links and leaving your arguments in an incomplete state.

Besides, people who read the manual offline will not have the chance to follow those 963

88

SiSU: - Manualul Live Systemscomplete.sisudoc.org/manual/pdf/live-manual.portrait.ro.a4.pdf· ManualulLiveSystems ProiectulLiveSystems Copyright©2006-2014LiveSystemsProject - [PDF Document] (97)

Manualul Live Systems

links.

• Avoid branding and things that violate the license under which themanual is published 964

Try to avoid branding as much as possible. Keep in mind that other downstream 965

projects might make use of the documentation you write. So you are complicatingthings for them if you add certain specific material.

live-manual is licensed under the GNU GPL. This has a number of implications that 966

apply to the distribution of the material (of any kind, including copyrighted graphics orlogos) that is published with it.

• Write a first draft, revise, edit, improve, redo if necessary 967

- Brainstorm!. You need to organize your ideas first in a logical sequence of events. 968

- Once you have somehow organized those ideas in your mind write a first draft. 969

- Revise grammar, syntax and spelling. Keep in mind that the proper names of the 970

releases, such as jessie or sid , should not be capitalized when referred to as codenames. In order to check the spelling you can run the “spell” target. i.e. make spell

- Improve your statements and redo any part if necessary. 971

• Chapters 972

Use the conventional numbering system for chapters and subtitles. e.g. 1, 1.1, 1.1.1, 973

1.1.2 ... 1.2, 1.2.1, 1.2.2 ... 2, 2.1 ... and so on. See markup below.

If you have to enumerate a series of steps or stages in your description, you can also use 974

ordinal numbers: First, second, third ... or First, Then, After that, Finally ... Alternativelyyou can use bulleted items.

• Markup 975

And last but not least, live-manual uses ‹SiSU› to process the text files and produce 976

a multiple format output. It is recommended to take a look at ‹SiSU’s manual› to getfamiliar with its markup, or else type:

977

$ sisu --help markup

Here are some markup examples that may prove useful: 978

- For emphasis/bold text: 979

980

*{foo}* or !{foo}!

produces: foo or foo . Use it to emphasize certain key words. 981

- For italics: 982

983

89

SiSU: - Manualul Live Systemscomplete.sisudoc.org/manual/pdf/live-manual.portrait.ro.a4.pdf· ManualulLiveSystems ProiectulLiveSystems Copyright©2006-2014LiveSystemsProject - [PDF Document] (98)

Manualul Live Systems

/{foo}/

produces: foo. Use them e.g. for the names of Debian packages. 984

- For monospace: 985

986

#{foo}#

produces: foo. Use it e.g. for the names of commands. And also to highlight some key 987

words or things like paths.

- For code blocks: 988

989

code{

$ foo# bar

}code

produces: 990

991

$ foo# bar

Use code{ to open and }code to close the tags. It is important to remember to leave a 992

space at the beginning of each line of code.

19.2 Guidelines for translators 993

This section deals with some general considerations to be taken into account when 994

translating the contents of live-manual.

As a general recommendation, translators should have read and understood the translation995rules that apply to their specific languages. Usually, translation groups and mailing listsprovide information on how to produce translated work that complies with Debian qualitystandards.

Note: Translators should also read ‹Contributing to this document›. In particular the 996

section ‹Translation›

90

SiSU: - Manualul Live Systemscomplete.sisudoc.org/manual/pdf/live-manual.portrait.ro.a4.pdf· ManualulLiveSystems ProiectulLiveSystems Copyright©2006-2014LiveSystemsProject - [PDF Document] (99)

Manualul Live Systems

19.2.1 Translation hints 997

• Comments 998

The role of the translator is to convey as faithfully as possible the meaning of words, 999

sentences, paragraphs and texts as written by the original authors into their targetlanguage.

So they should refrain from adding personal comments or extra bits of information of 1000

their own. If they want to add a comment for other translators working on the samedocuments, they can leave it in the space reserved for that. That is, the header ofthe strings in the po files preceded by a number sign # . Most graphical translationprograms can automatically handle those types of comments.

• TN, Translator’s Note 1001

It is perfectly acceptable however, to include a word or an expression in brackets in the 1002

translated text if, and only if, that makes the meaning of a difficult word or expressionclearer to the reader. Inside the brackets the translator should make evident that theaddition was theirs using the abbreviation “TN” or “Translator’s Note”.

• Impersonal sentences 1003

Documents written in English make an extensive use of the impersonal form “you”. In 1004

some other languages that do not share this characteristic, this might give the falseimpression that the original texts are directly addressing the reader when they areactually not doing so. Translators must be aware of that fact and reflect it in theirlanguage as accurately as possible.

• False friends 1005

The trap of “false friends” explained before especially applies to translators. Double 1006

check the meaning of suspicious false friends if in doubt.

• Markup 1007

Translators working initially with pot files and later on with po files will find many 1008

markup features in the strings. They can translate the text anyway, as long as it istranslatable, but it is extremely important that they use exactly the same markup as theoriginal English version.

• Code blocks 1009

Even though the code blocks are usually untranslatable, including them in the translation 1010

is the only way to score a 100% complete translation. And even though it meansmore work at first because it might require the intervention of the translators if the codechanges, it is the best way, in the long run, to identify what has already been translatedand what has not when checking the integrity of the .po files.

• Newlines 1011

91

SiSU: - Manualul Live Systemscomplete.sisudoc.org/manual/pdf/live-manual.portrait.ro.a4.pdf· ManualulLiveSystems ProiectulLiveSystems Copyright©2006-2014LiveSystemsProject - [PDF Document] (100)

Manualul Live Systems

The translated texts need to have the exact same newlines as the original texts. Be 1012

careful to press the “Enter” key or type if they appear in the original files. Thesenewlines often appear, for instance, in the code blocks.

Make no mistake, this does not mean that the translated text needs to have the same 1013

length as the English version. That is nearly impossible.

• Untranslatable strings 1014

Translators should never translate: 1015

- The code names of releases (which should be written in lowercase) 1016

- The names of programs 1017

- The commands given as examples 1018

- Metadata (often between colons :metadata: ) 1019

- Links 1020

- Paths 1021

92

SiSU: - Manualul Live Systemscomplete.sisudoc.org/manual/pdf/live-manual.portrait.ro.a4.pdf· ManualulLiveSystems ProiectulLiveSystems Copyright©2006-2014LiveSystemsProject - [PDF Document] (101)

Manualul Live Systems

SiSU Metadata, document information

Document Manifest @:

‹http://complete.sisudoc.org/manual/manifest/live-manual.ro.html›Title: Manualul Live Systems

Creator: Proiectul Live Systems <[emailprotected]>

Rights: Copyright: Copyright (C) 2006-2014 Live Systems Project

License: Acest program este liber: poate fi redistribuit și/sau modificat în conformitate cu termenii Licenței Publice Generale GNU

(GPL), precum este publicată de către Free Software Foundation, fie versiunea 3 a licenței, sau (opțional) orice altă versiune

ulterioară..

Acest program este distribuit cu speranța că va fi util, dar FĂRĂ NICIO GARANȚIE; fără a avea garanția VANDABILITĂȚII sau

ÎNDEPLINIRII UNUI ANUME SCOP. Vezi Licența Publică Generală GNU pentru mai multe detalii.

Ar trebui să fi orimit o copie a Licenței Publice Generale GNU împreună cu acest program. În caz contrar, vezi ‹http://www.gnu.org/licenses/›.

Textul complet al Licenței Publice Generale poate fi găsit în fișierul /usr/share/common-licenses/GPL-3.

Publisher: Proiectul Live Systems <[emailprotected]>

Date: 2014-08-27

Version Information

Sourcefile: live-manual.ssm.sstFiletype: UTF-8 assumed, file encoding check program unavailable

SourceDigest: SHA256(live-manual.ssm.sst)=06cf962f43c21e98708e3ebf343f4d43215dd14d5b4f2986beeb99865d0d116f-

Generated

Document (ao) last generated: 2017-06-19 16:16:36 +0000

Generated by: SiSU 7.1.9 of 2016w30/7 (2016-07-31)

Ruby version: ruby 2.1.3p242 (2014-09-19) [x86_64-linux-gnu]

93

SiSU: - Manualul Live Systemscomplete.sisudoc.org/manual/pdf/live-manual.portrait.ro.a4.pdf · ManualulLiveSystems ProiectulLiveSystems Copyright©2006-2014LiveSystemsProject - [PDF Document] (2024)

References

Top Articles
Latest Posts
Article information

Author: Lakeisha Bayer VM

Last Updated:

Views: 5462

Rating: 4.9 / 5 (69 voted)

Reviews: 92% of readers found this page helpful

Author information

Name: Lakeisha Bayer VM

Birthday: 1997-10-17

Address: Suite 835 34136 Adrian Mountains, Floydton, UT 81036

Phone: +3571527672278

Job: Manufacturing Agent

Hobby: Skimboarding, Photography, Roller skating, Knife making, Paintball, Embroidery, Gunsmithing

Introduction: My name is Lakeisha Bayer VM, I am a brainy, kind, enchanting, healthy, lovely, clean, witty person who loves writing and wants to share my knowledge and understanding with you.